Request for Proposal to Solicitation W912DR26RA035, Rocket Missile Maintenance Facility (RMMF) Letterkenny Army Depot (LEAD) Precision Strike Missile System (PrSM) and Commercial Vehicle Access Control Point (ACP)
SOL #: W912DR26RA035Solicitation
Overview
Buyer
DEPT OF DEFENSE
Dept Of The Army
W2SD ENDIST BALTIMORE
BALTIMORE, MD, 21201-2526, United States
Place of Performance
Place of performance not available
NAICS
Commercial and Institutional Building Construction (236220)
PSC
Construction Of Missile System Facilities (Y1BF)
Set Aside
No set aside specified
Original Source
Timeline
1
Posted
Mar 31, 2026
2
Last Updated
Apr 24, 2026
3
Submission Deadline
Jun 1, 2026, 4:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, through W2SD ENDIST BALTIMORE, has issued a Request for Proposal (RFP) W912DR26RA035 for a Design-Bid-Build construction project at Letterkenny Army Depot (LEAD). This opportunity involves the construction of a new Rocket Missile Maintenance Facility (RMMF) and the replacement of the Voelz Gate Access Control Point (ACP). Proposals are due June 1, 2026, at 12:00 PM EDT.
Scope of Work
The project encompasses two primary components:
- Rocket Missile Maintenance Facility (RMMF): New construction of an approximate 45,000 SF RMMF warehouse with associated administrative support functions. This includes an adjacent 10,000 SF storage building and a 1,000 SF forklift charging shed. Site development involves earthwork, Best Management Practices (BMPs), fencing, roadways, and hardscape areas to support munitions loading and unloading.
- Voelz Gate Access Control Point (ACP): Replacement of the existing ACP with a new facility. This new ACP will feature an approximate 1,600 SF combined gatehouse, inbound/outbound lanes with commercial vehicle inspection canopies, and associated active and passive vehicle controls. Site development for the ACP includes earthwork, BMPs, fencing, roadways, and hardscape areas to support access control and commercial vehicle inspections.
Contract & Timeline
- Type: Design-Bid-Build Solicitation (RFP)
- Product/Service Code: Y1BF (Construction Of Missile System Facilities)
- Set-Aside: None specified
- Proposal Due: June 1, 2026, 12:00 PM EDT
- RFI Submission Deadline: May 11, 2026, 11:00 AM EDT
- Published (Amendment 0004): April 24, 2026
Amendment 0004 Details
This amendment introduces several key changes:
- Proposal Submission: The requirement for all proposals to be submitted via a zip file has been removed.
- Specifications: Replaced Specification 01 33 29 (Sustainability Requirements and Reporting) and Paragraph 2.18.1 in Specification 28 31 76.
- Drawings: Multiple drawings for the Voelz Access Control Point (ACP) have been reissued with marked changes.
- RFI Deadline: The RFI submission deadline is now May 11, 2026, at 11:00 AM EDT.
- Site Visit: An attendance sheet for the site visit held on April 22, 2026, has been provided.
Contact Information
For inquiries, contact Shawn Handley at shawn.d.handley@usace.army.mil or 410-962-2063.
People
Points of Contact
Shawn HandleyPRIMARY
Tonja DrekeSECONDARY