Request for Quote - W912DY26QA181 - Ft Gordon Vincent Hall PH1 MCA2
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers, Huntsville Center, Furniture Team is issuing a Request for Quote (RFQ) W912DY26QA181 for the procurement and installation of industrial storage and power strips at Fort Gordon, GA. This unrestricted opportunity involves furnishing and installing products into Vincent Hall, Phase 1, and MCA2. Quotes are due by June 22, 2026, at 12:00 PM Central Time.
Scope of Work
This solicitation requires contractors to provide all furnishings, materials, equipment, labor, supervision, and management necessary for the delivery, load/unload, placement, assembly, securing, and disposal of associated packaging. Key installation locations include Vincent Hall, Phase 1, and MCA2 at Fort Eisenhower, CCoE Campus. The scope includes:
- Installation of furniture in accordance with the Statement of Work (SOW), potentially including electrical hardwiring.
- Development and adherence to a phased installation plan and schedule.
- Verification of building conditions and coordination with end-users for finish selections.
- Provision of comprehensive technical documentation, including product information, drawings, and compliance documentation.
- Compliance with safety regulations and submission of an Accident Prevention Plan (APP).
Furniture plans for Vincent Hall Phase 1 and MCA2 detail specific layouts and items, clarifying which items are government-furnished (GFGI) or "Not In Contract" (NIC) versus those to be provided by the contractor. Electrical plans for Vincent Hall Phase 1 are also provided, detailing power distribution and equipment layout.
Contract & Timeline
- Opportunity Type: Request for Quote (RFQ)
- Solicitation Number: W912DY26QA181
- Set-Aside: Unrestricted
- Product Service Code: 7195 (Miscellaneous Furniture And Fixtures)
- NAICS Code: 337126 (850 employees size standard)
- Place of Performance: Fort Gordon, GA 30905
- Estimated Award Date: August 10, 2026
- Period of Performance (Installation):
- Vincent Hall, Ph. 1: December 7, 2026 – February 1, 2027
- MCA 2: March 29, 2027 – April 26, 2027
- Storage: Quotes must include costs for up to six months of storage for specific CLINs.
Submission & Evaluation
- Quotes Due: June 22, 2026, by 12:00 PM Central Time.
- Questions Due: June 1, 2026, by 12:00 PM Central Time.
- Submission Method: Email to Travian.A.James@usace.army.mil AND CEHNC-FurnitureQuotes@usace.army.mil. PIEE is recommended for submission.
- Required Documents: SF1449, Excel version of Attachment #1, Word version of Attachment #8, and Technical Data Sheets for each item.
- Evaluation Criteria: Technical, Schedule, Past Performance, and Price.
- Award Basis: Best value, determined by the technically acceptable quote with the lowest total evaluated price.
- Technical Documentation: Bidders must complete and return Attachment 8 (Technical Documents Checklist) in Word format, demonstrating compliance with Furniture Item Descriptions (FID) using manufacturer's catalogs or CAD drawings.
Contact Information
- Primary Contact: Travian James, travian.a.james@usace.army.mil