Restoration of Northwest Storm Drain Infrastructure
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force (FA4819 325 CONS PKP) has issued a Presolicitation for the Restoration of Northwest Storm Drain Infrastructure at Tyndall AFB main airfield. This effort aims to repair and replace degraded stormwater infrastructure to ensure proper drainage and mitigate safety hazards. The estimated magnitude for this project is between $5,000,000 and $10,000,000. Responses are due by February 18, 2026.
Scope of Work
The primary objective is to repair and replace existing stormwater infrastructure, including drainpipes and inlet structures, within selected areas of the Tyndall AFB main airfield. This is necessary due to the current degraded condition of the infrastructure, which poses safety hazards such as sinkholes and inadequate drainage noted by maintenance personnel.
Contract & Timeline
- Type: Presolicitation (for a future task order)
- Magnitude: $5,000,000 - $10,000,000 (in accordance with FAR 36.204(g))
- Set-Aside: None specified
- Product/Service Code: Z2JZ - Repair Or Alteration Of Miscellaneous Buildings
- Response Due: February 18, 2026, 8:30 PM ET
- Published: February 18, 2026
Additional Notes
This notice serves as a presolicitation to inform potential bidders of an upcoming requirement. Interested parties should monitor SAM.gov for the release of the formal solicitation. Contact information for inquiries is provided.