RFIA Matrix for End-to-End Support Test Equipment (EASTE)
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force, specifically the 402nd Software Engineering Group (SWEG) and 579th Software Engineering Squadron (SWES), is issuing a Request for Information (RFI) for the RFIA Matrix for End-to-End Support Test Equipment (EASTE). This RFI is for information and planning purposes only, aimed at identifying industry capabilities to support the sustainment of the AN/ALQ-161A system. Responses are due March 4, 2026.
Scope of Work
This RFI seeks information from contractors capable of providing the RFIA Matrix, as defined by the Equipment List (EL). The requirement supports the ongoing retrofit of the entire fleet of EASTE carts with a new three-channel Radio Frequency Interface (RFI). This upgrade enhances the electronic warfare (EW) testing fidelity of the AN/ALQ-161A system, which is verified by the EASTE before flight operations.
Program Requirements
Respondents are asked to provide:
- Company Profile: General experience providing the RFIA Matrix for EASTE, similar products offered to the Government, and business size/type (e.g., small, woman-owned, veteran-owned) under NAICS code 541519.
- Capability: Confirmation of authorized reseller status for RFIA Matrix.
- Proposed Approach: A simple outline and schedule (lead time) for the effort, anticipated subcontracting percentage (if applicable), and a total cost estimate. The Government anticipates a firm-fixed price contract for this effort.
- Additional Comments: Any questions or comments regarding this effort.
Contract & Timeline
- Type: Request for Information (RFI) / Sources Sought
- Set-Aside: None specified (for planning purposes)
- Response Due: March 4, 2026, 04:00 PM EST
- Published: February 18, 2026
- Place of Performance: Warner Robins, GA
Additional Notes
This RFI does not constitute a solicitation, and the Government will not pay for information submitted. No determination has been made regarding the viability of this potential requirement. Interested vendors must request documents from the Contracting Officer, Teresa Duval (teresa.duval@us.af.mil), or Contract Specialist, Jonathon VanBrunt (jonathon.vanbrunt@us.af.mil). Documents will only be distributed to SAM.gov registered DOD contractors.