RFP - PAB Liquid Argon Dewar Lease and Filling
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Fermi Forward Discovery Group, LLC (FFDG), operating the Fermi National Accelerator Laboratory (FNAL) for the U.S. Department of Energy, is soliciting proposals for a Firm-Fixed-Price (FFP) subcontract for PAB Liquid Argon Dewar Lease and Filling services. This opportunity supports FNAL operations in Batavia, Illinois. Proposals are due by February 26, 2026, at 3:00 PM CT.
Scope of Work
The primary requirement is the lease and filling of PAB Liquid Argon Dewars, with specific technical requirements detailed in Attachment A. Key specifications include:
- Dewar Volume: 3,000-5,000 Liters, rated to or greater than 250 psig.
- Liquid Argon Purity: Minimum 99.999%.
- Usage Rates: Average liquid usage of 745 cubic feet per month, with peak usage up to 350 cubic feet in a one-week period, up to four times per year.
- Deliveries: Must be made within 3-days' notice, maintaining liquid levels above 400 gallons.
- Instrumentation: Dewars must include pressure and level transmitters with 4-20 mA or 0-10 VDC outputs for integration with FNAL's PLC.
- Code Compliance: Adherence to national codes such as ASME Boiler and Pressure Vessel Code, ASME B31.3, CGA S-1.3, and API 521 is mandatory.
Contract Details
- Contract Type: Firm-Fixed-Price (FFP) Subcontract.
- Period of Performance: A 2-year base period (March 1, 2026 – February 28, 2028), with three additional 1-year option periods, potentially extending the contract to five years.
- Set-Aside: None specified.
- Place of Performance: Fermi National Accelerator Laboratory campus, Batavia, Illinois.
Submission & Evaluation
- Proposal Deadline: February 26, 2026, at 3:00 PM CT.
- Submission Method: Proposals, including all required documents, must be emailed to bhopkins@fnal.gov.
- Evaluation Basis: Lowest Price Technically Acceptable (LPTA).
- Factor 1 (Technical): Acceptable/Unacceptable, based on meeting specifications in Attachment A.
- Factor 2 (Price): Completeness and reasonableness, with award to the lowest evaluated price among technically acceptable offers.
- Factor 3 (Responsibility): Responsiveness, financial capability, performance history, and certifications.
- Award: FFDG anticipates making an award without discussions; offerors should submit their best terms initially.
Required Attachments & Compliance
Bidders must complete and submit several mandatory attachments, including a Pricing Schedule (Att B), General Terms and Conditions (Att C), Certificate of Insurance (Att D), ES&H requirements (Att E), Subcontractor Annual Representations & Certifications (Att F), Proposal Certifications (Att G), and Fermilab Safety Code Requirements (Att H). Strict insurance requirements (Att D) and Environment, Safety & Health (ES&H) protocols (Att E) apply for onsite work. Access to Fermilab facilities requires a badge, and U.S. citizenship is preferred for approvals.