Riprap Overlay at Pomona Lake Project Dam
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
The solicitation is amended (0003) to revise the bid schedule to align with the specifications and add a total all CLINs line; and to provide specification 01 50 00, Section 2.2.2- Attachment 1. The solicitation is amended (0002) to remove the beach parking area from CLIN 0001 of the bid schedule and beach parking and staging area from CLIN 0001 of the supplemental bid schedule.The solicitation is amended to comply with the President?s Executive Orders, and revise specifications.CONSTRUCTION SERVICES FOR POMONA DAM. THE PROJECT WILL CONSIST OF REGRADING, AND OVERLAYING THE DAMAGED PORTIONS OF THE UPSTREAM EMBANKMENT SLOPE WITH BEDDING AND RIPRAP, REPAIRING ANY ACCESS ROADS AS NECESSARY, DEBRIS REMOVAL AND ANY OTHER INCIDENTAL WORK. THE WORK WILL TAKE PLACE NEAR POMONA, KS IN OSAGE COUNTY. THIS REQUIREMENT IS SET ASIDE FOR SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB). AN ORGANIZED SITE VISIT HAS BEEN SCHEDULED FOR 13 MARCH AT 10 AM.