RMAC CS 26-1 for the acquisition of one (1) Class-III Liquefied Petroleum Gas (LPG) Forklift.
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Army Contracting Command-Redstone is soliciting quotes for the acquisition of one (1) Class-III Liquefied Petroleum Gas (LPG) Forklift for the U.S. Army Combat Capabilities Development Command (DEVCOM) Aviation and Missile Center (AvMC) at Redstone Arsenal, AL. This is a 100% Total Small Business Set-Aside combined synopsis/solicitation. Quotes are due by 3:00 PM (CST) on February 27, 2026.
Scope of Work
The requirement is for one (1) Class-III LPG Forklift with a 6,000 lbs. capacity and Load Capacity Certification. Key specifications include a maximum fork height reach of 10 feet or 120 inches or greater, pneumatic tires, headlights, mirrors, backup alarm, strobe light, seatbelt, 48-inch forks with 72-inch fork extensions, side shiftable forks with positioner, a grab handle, and an integrated LPG tank. The equipment must be deliverable within 30 days of award. Travel is not required for this contract.
Contract & Timeline
- Type: Firm Fixed-Price (Combined Synopsis/Solicitation)
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- NAICS: 333924 (Small Business Size Standard: 900 employees)
- Quotes Due: February 27, 2026, 3:00 PM CST
- Published: February 2, 2026
- Delivery Location: US ARMY AMRDEC, Building 7434, Dogwood Road, Redstone, Arsenal, AL 35898
Evaluation
Offers will be evaluated based on technical capability of the items to meet government requirements, price, and delivery. All items must include shipping costs FOB Destination to Redstone Arsenal, AL. Payment will be made via Wide Area Workflow.
Additional Notes
This acquisition incorporates provisions and clauses from Federal Acquisition Circular 2025-05, including FAR 52.212-1 (Instructions to Offerors), FAR 52.212-2 (Evaluation - Commercial items), and various DFARS clauses related to cybersecurity and supply chain risk. Electronic quotes are required.