Roadway Surface Blading/Grading Needed for the Mark Twain National Forest

SOL #: 12444526Q0014Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA EAST 6
Atlanta, GA, 303092449, United States

Place of Performance

Gainesville, MO

NAICS

Highway (237310)

PSC

Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways (Z2LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 6, 2026
2
Submission Deadline
Mar 27, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting proposals for Roadway Surface Blading/Grading for the Mark Twain National Forest across numerous counties in Missouri. This is a Total Small Business Set-Aside for a Firm-Fixed Price, Indefinite Delivery Indefinite Quantity (IDIQ) contract. The services include re-establishing road crowns and slopes, incidental cleanup, and drainage work. Proposals are due March 27, 2026, at 5:00 PM CT.

Scope of Work

This opportunity requires comprehensive road maintenance services, including:

  • Surface Blading: Re-establishing road crowns and slopes using a motor grader (minimum 12-foot moldboard), requiring at least five passes. This includes cleaning and reshaping ditch lines (minimum 1 foot depth), removing obstructions (fallen trees, limbs, rocks >3 inches), and ensuring proper drainage.
  • Culvert Installation/Replacement: Trenching, bedding, and compaction for culverts, with responsibility for removal and disposal of old culverts. New culverts must be American-made (corrugated metal or HDPE) and approved by the Contracting Officer's Representative (COR). "Dig-rite" must be contacted before excavation.
  • Aggregate Placement: Delivery and tailgate spreading of specified aggregate, with depth, width, and length determined by the COR. Crushed aggregate must comply with Missouri Standard Specifications, and weight tickets are required. Lead testing is mandatory for aggregate from specific Missouri counties.

Contract Details & Timeline

  • Contract Type: Firm-Fixed Price, Indefinite Delivery Indefinite Quantity (IDIQ)
  • Duration: Base Year (May 1, 2026 - April 30, 2027) plus four (4) potential option years, extending through April 30, 2031.
  • Performance Seasons: Spring blading (May 1 - July 1) and Fall blading (September 1 - November 1), weather permitting.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 237310 (Highway, Street, and Bridge Construction)
  • Small Business Size Standard: $45.0 million
  • Offer Due Date: March 27, 2026, at 5:00 PM CT
  • Published Date: March 6, 2026

Submission & Evaluation

  • Submission Method: Email proposals to Michael.Wheelock@usda.gov.
  • Proposal Components: Technical proposal, price proposal, and contractor representations and certifications.
  • Evaluation Criteria: Lowest Price Technically Acceptable (LPTA). Offers will be evaluated for acceptability on Technical Capability and Past Performance. Award will be made to the lowest-priced offer receiving an 'Acceptable' rating in all non-cost factors.
  • Eligibility: Offerors must have an active entity registration in the System for Award Management (SAM).

Key Attachments & Notes

Key attachments include an Experience Questionnaire (Attachment A), Schedule of Items (Attachment B), Statement of Work (Attachment C), and Wage Determination (Attachment D). The Wage Determination is crucial for accurate labor cost estimation. Site visits can be arranged by emailing Darren Morris at darren.w.morris@usda.gov.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Mar 6, 2026
Roadway Surface Blading/Grading Needed for the Mark Twain National Forest | GovScope