Roadway vegetation maintenance services (842) for the Whitman Ranger District, Wallowa Whitman National Forest, Baker City, OR.
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USDA Forest Service, Whitman Ranger District, Wallowa Whitman National Forest is soliciting proposals for Roadway Vegetation Maintenance Services (842) in Baker City, OR, specifically within Baker and Union counties. This is a Total Small Business Set-Aside for a Firm-Fixed Price contract. The scope includes an estimated 55.8 base miles with an additional 44.4 optional miles. Quotes are due by July 8, 2026, at 3:00 PM Pacific Time.
Scope of Work
Services involve comprehensive vegetation maintenance along roadways, including the removal of trees (up to 9 inches in diameter), vegetation within 5 feet of culvert inlets, and ensuring 14 feet of overhead clearance. Horizontal clearance within 6 feet of cut slope ditch lines and fill slope hinge points is also required. Debris management, including scattering woody debris (not exceeding 1 foot deep), is part of the scope. Exclusions include no vegetation removal within 10 feet of fish-bearing streams and no debris piles at culvert outlets. Work is measured and paid by the mile.
Contract Details
- Contract Type: Firm-Fixed Price
- Set-Aside: Total Small Business (NAICS 237310, size standard $34,000,000.00)
- Period of Performance: August 1, 2026, through November 27, 2026 (Base Period)
- Place of Performance: Wallowa-Whitman National Forest, Baker and Union counties, Oregon.
Key Requirements & Deliverables
Contractors must submit a Contractor Work Plan (including Traffic Control, Safety, and Fire Plans), a Contractor Quality Control Plan (QCP), and a Contractor Property Plan within 14 calendar days of award. Key personnel, including a Contract Manager, must be designated. Performance will be monitored against Acceptable Quality Levels (AQLs) detailed in the Quality Assurance Surveillance Plan (QASP).
Submission & Evaluation
- Quotes Due: July 8, 2026, 3:00 PM PT, via email to thomas.hammerle@usda.gov.
- Questions Due: June 24, 2026, 3:00 PM PT, via email to thomas.hammerle@usda.gov.
- Site Survey: Encouraged between June 8-12, 2026.
- Submission Format: Two volumes: Volume I (Technical Proposal) and Volume II (Price Proposal).
- Evaluation: Best value to the Government, considering price, past performance, and technical capability.
- Eligibility: Offerors must have an active SAM.gov registration.
Attachments
Key documents include the Performance Work Statement (PWS), Schedule/Pricing, Wage Determination, Quality Assurance Surveillance Plan (QASP), and Road Vegetation Maintenance Maps.