ROC Generator
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, through W7N2 USPFO ACTIVITY TXANG 147, is soliciting proposals for the ROC Generator project at Ellington Field, Houston, TX. This Total Small Business Set-Aside opportunity involves the procurement, installation, and commissioning of a new 350KW diesel emergency standby generator system. Offers are due by July 3, 2026, at 2:00 PM local time.
Scope of Work
The contractor shall furnish all labor, parts, tools, and equipment necessary to procure, install, test, commission, and place into service a complete 350KW diesel emergency standby generator system for Building 1191. This is a turnkey project that includes the removal of existing generator infrastructure, structural evaluation and modification of the generator pad, electrical and Automatic Transfer Switch (ATS) integration, fuel system integration, grounding, bonding, startup, and load bank testing. The work must comply with all applicable international, federal, state, local, DoD, Air Force, UFC, NFPA, NEC, and other relevant codes and standards. The generator system must support continuous non-interruptible power for a minimum of 72 hours at full electrical load.
Contract Details
- Opportunity Type: Solicitation (W50S7726RA001)
- Contract Type: Implied Firm Fixed Price (based on Section L)
- Estimated Magnitude: Between $100,000 and $250,000
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Place of Performance: Ellington Field, Houston, TX
- Period of Performance: Work to begin within 10 calendar days and complete within 90 calendar days after Notice to Proceed (NTP), excluding approved generator manufacturing lead times.
- Bonds: Performance and Payment Bonds are required.
- Labor Standards: Statutory construction labor standards and payment protection requirements apply, with a DBA Wage Determination provided.
Site Visit & Key Dates
A mandatory site visit is required for all offerors, with failure to attend resulting in disqualification.
- Individual Site Visits: Contact Mr. Cory Vincent (cory.vincent@us.af.mil, 281-929-2769) by June 8, 2026, to arrange. Background check information is required for access.
- Organized Site Visit: Scheduled for June 18, 2026, at 10:00 AM CST. Meeting point: Ellington Field visitors center, 11210 Blume Ave, Houston, TX 77034.
- Site Visit Questions Due: NLT June 23, 2026, 2:00 PM CST.
Submission & Evaluation
- Offers Due: July 3, 2026, at 2:00 PM local time.
- Offer Validity: Offers must be valid for at least 90 calendar days.
- Evaluation Factors: Site visit attendance (mandatory for qualification), Price, and Ability to meet technical capabilities.
Contact Information
- Primary Contact: MSgt Buddy Ciemiengo (buddy.ciemiengo.1@us.af.mil)