Roll Up Door Replacement at Louisville Repair Station
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
The Contractor shall remove the old roll up door and supply/install 1 (one) new steel rollup door for the Louisville Repair Station in accordance with the Specifications.**NOTICE** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on ?View FFP Contract Changes Playbook Here?. 12 September 2025 - Amendment 0001 issued to extend solicitation to 1000AM ET, 19 September 2025.18 September 2025 - Amendment 0002 issued to extend solicitation from 10:00AM ET, 19 September 2025 to 1:00PM ET, 22 September 2025.