ROMO-ROAD STRIPING

SOL #: 140PS126Q0022Solicitation

Overview

Buyer

Interior
National Park Service
DOI, NPS CONOPS STRATEGIC
Washington, DC, 20240, United States

Place of Performance

Place of performance not available

NAICS

Highway (237310)

PSC

Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways (Z2LB)

Set Aside

No set aside specified

Timeline

1
Posted
May 20, 2026
2
Submission Deadline
Jun 25, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Interior, National Park Service (NPS), specifically the DOI, NPS CONOPS STRATEGIC office, has issued a Solicitation (RFQ) for commercial construction services to perform road striping at Rocky Mountain National Park (ROMO) in Colorado. This is a 100% total small business set-aside with an estimated magnitude under $500K. Proposals are due June 25, 2026, by 5 PM ET.

Scope of Work

The project involves comprehensive pavement marking services, including center and edge striping, parking stall striping, intersections, arrows, highway numbering, hatched areas, miscellaneous symbols, stop lines, crosswalks, and accessible parking areas. The scope covers various locations within Rocky Mountain National Park, such as Hwy 34/Trail Ridge Road, Bear Lake Road, Alpine Visitor Center, Many Parks Curve, and the Beaver Meadows Entrance. Optional areas include additional parking along Bear Lake Road, Trail Ridge Road, and a section near Hidden Valley Curve.

The contractor is responsible for providing all traffic control, signage, and barricades, while the Government will supply stencils (except for specific items). All materials and application must strictly comply with Section 02618: Pavement Marking and MUTCD standards. This includes specific requirements for pavement marking paint (AASHTO M-248, Type "F" or waterborne) and reflective glass beads (AASHTO M-247, Type 1), along with detailed application rates.

Contract Details

  • Contract Type: Firm-Fixed Price commercial contract.
  • Product Service Code: Z2LB (Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways).
  • Set-Aside: 100% Total Small Business.
  • NAICS Code: 237310 (Highway, Street, and Bridge Construction) with a $45M size standard.
  • Estimated Magnitude: Under $500,000.
  • Period of Performance: Estimated 90 days from Notice to Proceed. On-site work must be completed within 30 consecutive work days between July 7th and October 5th, 2026.
  • Bonds: Performance and Payment Bonds are not required. An offer guarantee is also not required.
  • Buy American: The Buy American statute applies to construction materials.
  • Wage Determination: Prevailing wage rates and fringe benefits (CO20260014) apply, impacting labor costs.

Submission & Evaluation

  • Submission Deadline: June 25, 2026, by 5 PM ET.
  • Submission Method: Via email to Cole_Johnson@NPS.Gov, including both Price and Technical information.
  • Questions Deadline: June 11, 2026, by 5 PM ET, submitted in writing.
  • Evaluation Criteria: Lowest Price, Technically Acceptable (LPTA).
  • Evaluation Factors: Price and Technical Capability.
  • Technical Subfactors: Draft Schedule, Key Personnel, and adherence to MUTCD Standards.
  • Eligibility: Offerors must be registered and active in SAM.gov as a small business under NAICS 237310 and must not be debarred.

Special Requirements & Notes

Contractors must adhere to strict traffic control measures, including limited lane closures (max 15 minutes). Safety compliance (OSHA, accident prevention plans) and environmental regulations (wildlife, waste disposal outside park, no burning) are mandatory. All equipment must be washed and inspected by NPS prior to park entry. Required submittals include examples of previous work, manufacturer information, MSDS, construction schedule, insurance certificates, and accident prevention plans. The Limitations on Subcontracting clause (FAR 52.219-14) applies, requiring specific reporting.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Solicitation
Posted: May 20, 2026
ROMO-ROAD STRIPING | GovScope