ROOF INSPECTION, REPAIR AND MAINTENANCE

SOL #: W912C326BA002Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QM MICC-FORT BUCHANAN (RC)
FORT BUCHANAN, PR, 00934-4572, United States

Place of Performance

Fort Buchanan, PR

NAICS

Roofing Contractors (238160)

PSC

Repair Or Alteration Of Other Administrative Facilities And Service Buildings (Z2AZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Dec 4, 2025
2
Last Updated
Feb 12, 2026
3
Submission Deadline
Feb 4, 2026, 2:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Mission and Installation Contracting Command (MICC)-Fort Buchanan, Puerto Rico, is soliciting bids for Roof Inspection, Repair, and Maintenance services at Fort Buchanan, Puerto Rico. This is an Invitation for Bid (IFB) for a Firm Fixed Price Indefinite Delivery Indefinite Quantity (IDIQ) contract. The opportunity is a 100% Total Small Business Set-Aside. Bids are due by February 4, 2026, at 10:00 AM (PRLT).

Scope of Work

The contractor will provide all necessary administrative functions, personnel, materials, tools, equipment, services, transportation, and insurance for comprehensive roof inspection, repair, and maintenance. This includes initial roof inspection surveys and reports, roofing repair and/or replacement, furnishing required warranties, as-built drawing documentation, and maintenance of existing roofing systems. The work covers various roofing types such as concrete, corrugated metal, built-up asphalt, modified bituminous membrane, EPDM, SPF, metal panels, standing seam, asphalt shingles, and waterproof asphalt coatings. Incidental work related to roofing systems, such as structural repairs, roof access hatches, skylights, drainage, and electrical components, is also included. Services will be performed at Fort Buchanan, Puerto Rico, supporting various Army Reserve installations and facilities.

Contract Details

  • Contract Type: Firm Fixed Price Indefinite Delivery Indefinite Quantity (IDIQ)
  • Period of Performance: Base Period (1 year) plus four (4) 1-year option periods.
  • Estimated Magnitude: Between $5,000,000.00 and $10,000,000.00
  • Set-Aside: 100% Total Small Business Set-Aside
  • NAICS Code: 238160, Roofing Contractors (Size Standard: $19.0 Million)
  • Product Service Code: Z2AZ (Repair Or Alteration Of Other Administrative Facilities And Service Buildings)

Submission & Evaluation

  • Bid Submission Deadline: February 4, 2026, at 10:00 AM (PRLT). This date was extended by Amendment 0002.
  • Submission Method: Sealed offers (original and 1 copy) must be mailed to MICC Fort Buchanan (Attn: W912C326BA002, 34 Southgate Road Suite 1104, Fort Buchanan, PR 00934) or delivered to the secure bid box inside the Visitor Control Center (VCC) at the Borinqueneers Gate on Fort Buchanan.
  • Required Submissions: Bid guarantee (20% of bid price), all signed amendments, and any other required documents as per the solicitation. Failure to submit signed amendments may render the bid ineligible.
  • Evaluation: Award will be made to the responsible bidder submitting the lowest responsive bid, based on price and price-related factors.
  • Registration: Vendors must be registered and active in the System for Award Management (SAM) database (sam.gov).

Key Attachments

Bidders should review critical attachments:

  • Attachment 1: Schedule of Prices for detailed pricing structure.
  • Attachment 3: Fort Buchanan Building List for estimated roof areas.
  • Attachment 6: Roofing SOW and SPECS for comprehensive scope of work.
  • Attachment 4: Asbestos Operations and Maintenance Plan and Attachment 5: Lead-based Paint Operations and Maintenance Plan for safety and compliance requirements.

Important Notes

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6
Solicitation
Posted: Feb 12, 2026
View
Version 5
Solicitation
Posted: Feb 6, 2026
View
Version 4
Solicitation
Posted: Jan 30, 2026
View
Version 3Viewing
Solicitation
Posted: Jan 16, 2026
Version 2
Solicitation
Posted: Dec 18, 2025
View
Version 1
Solicitation
Posted: Dec 4, 2025
View
ROOF INSPECTION, REPAIR AND MAINTENANCE | GovScope