Roof Replacement

SOL #: 47PE5426Q0022Combined Synopsis/Solicitation

Overview

Buyer

General Services Administration
Public Buildings Service
PBS PROJECT DELIVERY CENTRAL - BRANCH D
Washington, DC, 20405, United States

Place of Performance

Chicago, IL

NAICS

Roofing Contractors (238160)

PSC

Maintenance Of Office Buildings (Z1AA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 21, 2026
2
Last Updated
May 29, 2026
3
Submission Deadline
Jun 12, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The General Services Administration (GSA), Public Buildings Service, is soliciting quotes for Roof Replacement Services at the 11 West Quincy Court Federal Building in Chicago, Illinois. This is a Total Small Business Set-Aside opportunity. The project involves a comprehensive roof replacement, including demolition and installation of a new conventional system. Quotes are due June 12, 2026, at 4:00 PM Central Time.

Scope of Work

The project entails removing existing roof drains, the vegetated roof system, and associated construction down to the concrete roof deck. The contractor will then perform concrete deck repair and install a new conventional roof system. This new system includes a vapor retarder, roof drains, insulation, roof membrane, and copings. Detailed technical specifications cover quality assurance, construction IAQ management, roofing, sheet metal coping and flashing, gypsum wallboard assemblies, painting, insulation, and storm drainage piping. Architectural and plumbing drawings provide the physical scope and technical details for demolition, new roof installation, and integration with existing plumbing systems.

Contract Details

  • Contract Type: Firm Fixed Price (FFP)
  • Estimated Value: Between $1,000,000 and $3,000,000
  • Period of Performance: Substantial Completion within 225 calendar days of Notice to Proceed (NTP); Contract Completion within 20 calendar days of Substantial Completion.
  • Liquidated Damages: $1,469.73 per calendar day.
  • Product Service Code (PSC): Z2AA (Repair or Alteration of Office Buildings)
  • NAICS Code: 238160 (Roofing Contractors) with a $19.0 million small business size standard.
  • Place of Performance: 11 West Quincy Court, Chicago, IL 60604.

Submission & Evaluation

Quotes are due June 12, 2026, at 4:00 PM Central Time, and must be submitted electronically via email to the Contracting Officer. The award will be made to the responsible firm whose quote is most advantageous to the Government, considering the following factors:

  1. Project Approach/Management Plan (Go/No-Go Technical Acceptability)
  2. Past Performance of Quoter (Significantly more important than Price)
  3. Price The Government may award without discussions, so offerors should submit their best quotes initially. Performance and Payment Bonds are required, as is a Bid Guarantee (Bid Bond). Quoters must be registered and active in SAM.gov. Prevailing wage rates for Cook County, Illinois, as detailed in the Wage Determination, must be used for labor cost calculations.

Key Attachments

Critical documents include the Past Performance Questionnaire (to be completed by references), Technical Specifications, Drawings, Wage Determination, and Bid Bond (SF 24). Amendment 02 replaced updated versions of SF 1442, Specifications, and Drawings, and incorporated pre-quote meeting minutes and RFI responses.

Contact Information

For questions, contact Johanna Nieves at 312-758-2467 or johanna.nieves@gsa.gov.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Combined Synopsis/Solicitation
Posted: May 29, 2026
Version 3
Combined Synopsis/Solicitation
Posted: May 28, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: May 1, 2026
View
Version 1
Sources Sought
Posted: Apr 21, 2026
View
Roof Replacement | GovScope