Roof Replacement for USDA ARS in Bushland, TX
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Department of Agriculture (USDA) Agricultural Research Service (ARS) is soliciting quotations for a Roof Replacement and Unit Heater Replacement project at its facility in Bushland, TX. This opportunity is a Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside with an estimated magnitude between $500,000 and $1,000,000. Quotations are due by May 11, 2026.
Scope of Work
The project involves replacing the existing low-slope roof system on Building 4 with a new standing seam metal roof, including new fascia, soffits, and metal wall panels to cover exposed steel frames and windows. It also includes the replacement of unit heaters. Two specific bid options are detailed: Option #1 for unit heater installation and flue routing, and Option #2 for installing gypsum board and insulation at interior clerestory windows and filling wall cavities. Bidders must account for identified asbestos-containing materials (ACM) in Building 4, which may require specialized abatement. All work must comply with specifications, drawings, and the Statement of Work.
Contract Details
- Contract Type: Firm-Fixed-Price Purchase Order
- Set-Aside: Service-Disabled Veteran-Owned Small Business (SDVOSB)
- NAICS Code: 238160 (Roofing Contractors), Small Business Size Standard: $19.0 Million
- Period of Performance: 180 days after Notice to Proceed
- Place of Performance: Bushland, TX 79012
Submission & Evaluation
- Quotations Due: May 11, 2026, 6:00 PM ET
- Submission Method: Email to Michael.Sherlock@usda.gov
- Questions Due: May 22, 2026
- Site Visit: May 20, 2026 (RSVP required)
- Evaluation Criteria: Lowest Price Technically Acceptable (LPTA), considering technical acceptability and past performance.
- Requirements: Offerors must include their SAM UEI number and hold prices firm for 90 calendar days. Compliance with Construction Wage Requirements (Potter County, TX) is mandatory.
Additional Notes
A Payment Bond or Irrevocable Letter of Credit must be approved within 10 calendar days after award. Invoices must be submitted electronically through the Invoice Processing Platform (IPP). Contractors will utilize ARS Form 371 for the Construction Progress and Payment Schedule and ARS Form 372 for payment requests.