Runoff Stations Concrete Repairs (Riesel, TX)

SOL #: 1232SA26Q0455Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Agricultural Research Service
USDA ARS AFM APD
BELTSVILLE, MD, 20705, United States

Place of Performance

Riesel, TX

NAICS

Poured Concrete Foundation and Structure Contractors (238110)

PSC

Maintenance Of Other Non Building Facilities (Z1PZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 10, 2026
2
Last Updated
May 8, 2026
3
Submission Deadline
May 8, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The United States Department of Agriculture (USDA), Agricultural Research Service (ARS), Grassland Soil and Water Research Laboratory (GSWRL) in Riesel, TX, is soliciting quotations for concrete repairs to runoff stations. This requirement is critical for maintaining research efforts at GSWRL. This is a Total Small Business Set-Aside. Quotations are due by May 8, 2026, at 5:00 PM ET.

Opportunity Details

This combined synopsis/solicitation (RFQ) seeks a contractor to perform concrete repairs on runoff stations at the GSWRL facility in Riesel, TX. The project includes a base scope and two optional scopes of work. An amendment (0001) was issued on April 28, 2026, providing a site visit sign-in sheet, revised attachments (Statement of Work, Drawings), and incorporating FAR clause 52.222-90 regarding DEI Discrimination.

Scope of Work

The project involves restoring the operational integrity of critical runoff stations. The contractor will provide all labor, tools, equipment, and parts for repairs, removal, and replacement. Bidders must verify site conditions prior to quoting.

  • Base Bid: Repair 3 runoff stations (SW12, SW17, W10).
  • Option 1: Repair 3 additional stations (W6, W12, W13).
  • Option 2: Repair 6 additional stations (Y2, Y6, Y8, Y10, Y13, Y14). Work must comply with federal/local codes, industry standards (e.g., IBC, ASTM), and health/safety regulations. Quality control is the contractor's responsibility.

Contract & Timeline

  • Contract Type: Firm Fixed Price
  • Period of Performance: 300 calendar days from Notice to Proceed (NTP).
  • Place of Performance: USDA-ARS Grassland Soil and Water Research Laboratory (GSWRL), Riesel, TX.
  • Set-Aside: Total Small Business Set-Aside (NAICS 238110, $19M size standard).
  • Response Due: May 8, 2026, 5:00 PM ET.
  • Questions Due: May 1, 2026.
  • Published Date: April 28, 2026 (Amendment 0001).

Submission & Evaluation

Quotations must be submitted via email to spencer.hamilton@usda.gov. Submissions must include pricing, signatures, SAM Unique Entity Identifier (UEI), acknowledgement of all amendments, active SAM.gov registration, and completed electronic representations and certifications.

  • Evaluation Criteria: Lowest Price Technically Acceptable (LPTA).
    • Technical Acceptability: Rated "acceptable" or "unacceptable."
    • Past Performance: Rated "acceptable" or "neutral." Unacceptable past performance will disqualify a quote.
    • Price: Evaluated for fairness and reasonableness.
  • Bonds: A bid guarantee is required for proposals over $150,000 (20% of proposed price, not to exceed $3,000,000). Payment and Performance Bonds are required for awards over $35,000 and $150,000, respectively.
  • Special Requirements: Submittals (materials, work hours, CPM schedule, cost proposal, safety plan, emergency contacts) are required prior to NTP. A full-time Superintendent with 30-hour OSHA training is required. Prevailing Davis-Bacon wage rates apply. FAR clause 52.222-90 (DEI Discrimination) is incorporated and must be flowed down to subcontractors.

People

Points of Contact

Spencer HamiltonPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4
Combined Synopsis/Solicitation
Posted: May 8, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Apr 29, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Apr 28, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 10, 2026
View