RUPTURE DISK ASSY
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support (WSS) Mechanicsburg, has issued a Solicitation (RFQ) for the repair of a RUPTURE DISK ASSY (PSC 4820, Valves, Nonpowered). The Government is seeking a Repair Turnaround Time (RTAT) of 125 days and requires Government Source Inspection (GSI). Responses are due January 29, 2026.
Scope of Work
This opportunity covers the repair and associated quality requirements for the RUPTURE DISK ASSY, specifically referencing CAGE 73030, Ref. No. NV822184-6. All repair work must adhere to the contractor's standard practices, manuals, drawings, and technical orders. A critical requirement is that the material must be mercury-free for use on submarines/surface ships, with strict protocols for any necessary mercury inclusion. Marking must comply with MIL-STD-130, REV N.
Contract & Timeline
- Type: Solicitation (RFQ)
- Set-Aside: None specified
- Response Due: January 29, 2026, 8:30 PM EST
- Published: January 22, 2026
Key Requirements & Submission
Offerors must provide a quote including the Quote Amount, Unit Price, Total Price, and proposed Repair Turnaround Time (RTAT). If the proposed RTAT exceeds 125 days, capacity constraints must be detailed. The resultant award will be issued bilaterally, requiring contractor acceptance. Quotes should also address a Testing & Evaluation (T&E) fee if the asset is determined Beyond Repair (BR/BER). Only authorized distributors of the original manufacturer's item will be considered, and proof of authorization on company letterhead is required with the offer. Freight is FOB Origin, with the Navy handling freight as per the Commercial Asset Visibility (CAV) Statement of Work. Packaging must comply with MIL-STD 2073.
Quality Assurance
The contractor is responsible for performing all inspection requirements and maintaining records for 365 calendar days post-delivery. Inspections and testing of repaired items must align with the original manufacturer's specifications and drawings.