SAB CMPD Sliding Gate relocation
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
The U.S. Embassy Libreville GABON is soliciting an upgrade of a sliding gate at a Government Owned
Residence Compound known as Sabliere Compound located in front of “Beach Club”.
The project will consist to:
• remove the existing manual sliding gate.
• create a U entrance to allow light of sight while exiting the compound as well as providing a safe
stop point while getting in the compound.
• Demolish 6 m of the existing perimeter wall.
• Build 16m length, 3.2m high of new perimeter wall matching the existing.
• Provide 85m2 of concrete as indicated on the attachment B
• Provide an automatic sliding gate to be operated through an inner/outer keypad.
• Extend the road by the main entrance and next to townhouse#1 unit#3 to allow proper access
to the compound as well as townhouse#1 apartments and parking.
• Relocate water lines and electrical cables as needed and coordinate any technical security
relocation with Post RSO section.
18FEB2025: The purpose of this amendment is to provide the minutes of the site visit and Q&A’s.