Sacramento River Erosion (SRE) C5 Pioneer Bridge Levee Improvements

SOL #: W9123825BA002Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W075 ENDIST SACRAMENTO
SACRAMENTO, CA, 95814-2922, United States

Place of Performance

Place of performance not available

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Parking Facilities (Y1LZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 21, 2025
2
Last Updated
Apr 25, 2025
3
Submission Deadline
Apr 24, 2025, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

See attached Bid Abstract

AMENDMENT 0002 - update the Technical Specifications Section 01 50 00, paragraph 2.2.2.1 (c) and include the date, time, and teams link for the bid opening.AMENDMENT 0001 - replaced specifications in its entirety and updated wage determination. Project is design-bid-build construction services to construct levee improvements at Sacramento River Erosion (SRE) Site 1, located under the I-80 Pioneer Bridge in Sacramento, California (CA). The project is anticipated to reduce the risk of levee failure from an erosion related levee breach for approximately 1,000 feet along the Sacramento River. The project is anticipated to include several erosion protection measures located above and below the average low flow water surface elevation (~7 feet NAVD88 as defined) using rock bank protection to include a 3.5-foot-thick lens of launchable Graded Stone C below the water surface to protect the bank from scour and erosion as well as Graded Stone C extended above the water surface to the top of the bank under the Pioneer Bridge section. The project is anticipated to include a 3.5-foot-thick lens of soil-rock mix above the water surface to protect the bank from wave wash generated by boat wakes and wind waves, demolition and removal of the existing upper bank material under the I-80 Pioneer Bridge section to provide a suitable foundation for the Graded Stone C, and In-stream Woody Material (IWM) to be placed below the water line to create in-stream cover for fisheries throughout the seasons and provide flow deflection along the bank. Work shall be completed by barge.

People

Points of Contact

Files

Files

Download
Download
View
View
View
View

Versions

Version 6Viewing
Solicitation
Posted: Apr 25, 2025
Version 5
Solicitation
Posted: Apr 18, 2025
View
Version 4
Solicitation
Posted: Apr 3, 2025
View
Version 3
Solicitation
Posted: Apr 2, 2025
View
Version 2
Solicitation
Posted: Mar 21, 2025
View
Version 1
Solicitation
Posted: Mar 21, 2025
View
Sacramento River Erosion (SRE) C5 Pioneer Bridge Levee Improvements | GovScope