Saginaw CDF Incremental Dike Raising Phase II
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Posting the Bid Abstract ***Amendment 0002 is issued to extend the bid due date from March 27, 2025 to April 10, 2025 and to provide government responses to questions received. FAR clauses 52.204-8 and 52.223-23 have been deleted and replaced with 52.204-8 (Deviation 2025-O0004) and 52.223-23 (Deviation 2025-O0004). All other terms and conditions remain unchanged.*** ***Amendment 0001 is issued to remove FAR Clauses in accordance with Class Deviation 2025-O0003 Restoring Merit Based Opportunity In Federal Contracts, Issued March 4, 2025. Full details can be found in the amendment document. All other terms and conditions remain unchanged.*** This project includes the construction of Phase II of the incremental raising of the south perimeter dike at the Saginaw CDF. Mobilize to the site through the northeast platform of the CDF. Clear and grub the brush and vegetation from the dike construction limits and all material borrow areas. Material from the CDF will be used to raise the dike, excluding NE cell. Grade and compact the raised south dike to EL +18 LWD with 3H:1V slopes including subgrade preparation and compaction prior of fill placement; raising area around weir to +12.5 LWD including elevating the weir to at least +15 LWD. Plant grass on the exterior slope of the raised dike for erosion control. Demobilize when complete.