Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Department of Agriculture, Forest Service is soliciting proposals for Trail Hardening MUT, Lake Loop Section in the Sam Houston National Forest, Lufkin, TX. This project involves comprehensive trail hardening, drainage improvements, surface course placement, and vegetation management. The estimated magnitude is between $500,000 and $1,000,000. Proposals are due April 17, 2026.
Scope of Work
The contractor will provide all materials, labor, tools, equipment, and supervision for:
- Trail Hardening: Surface blading (14.6 miles), surface course placement using specified TX-DOT aggregates, and tread hardening.
- Drainage Improvements: Shaping for positive drainage, installation of drain dips, furrow ditches, and various culverts.
- Vegetation Management: Trail mowing and clearing of brush and vegetative growth, followed by seeding of disturbed areas.
- Miscellaneous Structures: Maintenance and/or installation of items such as cattle guards, gates, FRP bridge decking, and planked LWC concrete.
- Site Logistics: No utilities are available at the project site. Daily removal of all trash and debris is required.
Contract Details
- Contract Type: Firm-Fixed-Price construction contract.
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- NAICS: 237990 - Other Heavy and Civil Engineering Construction (Size Standard: $45 million).
- Period of Performance: 365 calendar days after receipt of the Notice to Proceed (NTP). A proposed schedule is required within 10 days of NTP.
- Bonding: 100% Performance and Payment bonds are required within 10 calendar days after award.
- Place of Performance: Sam Houston National Forest, Lufkin, TX.
Submission & Evaluation
- Proposal Due Date: April 17, 2026, by 21:00 UTC.
- Questions Due Date: April 2, 2026.
- Submission Requirements: Proposals must be submitted in three volumes: Technical Capability (max 10 pages), Past Performance (max 5 pages), and Price Proposal.
- Evaluation Basis: Lowest Price Technically Acceptable (LPTA), considering Technical Capability, Past Performance, and Price.
- Site Visit: Offerors are strongly encouraged to visit the project site to familiarize themselves with local conditions.
Additional Notes
The government will provide staking for specific items. The Buy American Act-Construction Materials clause and Differing Site Conditions clause (FAR 52.236-2) are applicable.