Sam Houston Trail Bridge Replacement

SOL #: 127EAV26R0009Solicitation

Overview

Buyer

Agriculture
Forest Service
Southwestern Regional Office, Region 3
ALBUQUERQUE, NM, 87102, United States

Place of Performance

Lufkin, TX

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 9, 2026
2
Last Updated
Apr 10, 2026
3
Submission Deadline
May 29, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service, Region 3, is soliciting proposals for the Sam Houston Trail Bridge Replacement project. This Total Small Business Set-Aside opportunity involves the design and construction of approximately 18 replacement trail bridges on the Multi-Use Trail (MUT) within the Sam Houston National Forest, west of New Waverly, TX. The project addresses bridges damaged by storm events and erosion. Proposals are due May 29, 2026, at 1400 CST.

Scope of Work

This firm-fixed-price Design-Build contract requires all labor, materials, equipment, and supervision for the full design and construction of 18 trail bridges. The work is divided into three phases:

  • Phase A: Site Investigation and Analysis.
  • Phase B: Design and Construction Document Preparation.
  • Phase C: Removal and disposal of existing crossing infrastructure, construction of new crossings, and connection of trail approaches. Bridges must have a minimum deck width of 72 inches, increased spans, and freeboard, designed to withstand a 500-year storm with 30% debris blocking and 18 inches of freeboard. The contractor may adopt a phased approach to completion.

Contract Details

  • Contract Type: Firm-fixed-price Design-Build construction contract.
  • Magnitude: Estimated between $1,000,000 and $5,000,000.
  • Period of Performance: 390 calendar days after receipt of Notice to Proceed (NTP).
  • NAICS Code: 237310 – Highway, Street, and Bridge construction, with a $45 million size standard.
  • Place of Performance: Sam Houston National Forest, Lufkin, TX.
  • Bonding: Performance and payment bonds (100% of contract price) are required within 10 days of award.

Set-Aside

This procurement is a Total Small Business Set-Aside (FAR 19.5).

Evaluation Criteria

Proposals will be evaluated using a Best Value Tradeoff process, considering Technical Approach, Relevant Experience, Key Personnel (Project Manager, Design Engineer, Construction Superintendent), Past Performance, and Price. Non-price factors combined are approximately equal to price.

Submission Requirements & Key Dates

  • Proposals Due: May 29, 2026, at 1400 CST.
  • Submission Method: Electronically via email to david.l.watson@usda.gov. Proposals must be organized into Technical and Price volumes.
  • Site Visit: A site visit was held on April 3, 2026. Offerors are strongly encouraged to familiarize themselves with site conditions.
  • Contact: DAVID WATSON, DAVID.L.WATSON@USDA.GOV, 4802049319.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5Viewing
Solicitation
Posted: Apr 10, 2026
Version 4
Solicitation
Posted: Mar 26, 2026
View
Version 3
Solicitation
Posted: Mar 17, 2026
View
Version 2
Solicitation
Posted: Mar 17, 2026
View
Version 1
Pre-Solicitation
Posted: Feb 9, 2026
View
Sam Houston Trail Bridge Replacement | GovScope