Sam Houston Trail Bridge Replacement

SOL #: 127EAV26R0009Solicitation

Overview

Buyer

Agriculture
Forest Service
Southwestern Regional Office, Region 3
ALBUQUERQUE, NM, 87102, United States

Place of Performance

Lufkin, TX

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 9, 2026
2
Last Updated
Mar 17, 2026
3
Submission Deadline
Apr 17, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting proposals for a Firm-Fixed-Price Design-Build contract for the Sam Houston Trail Bridge Replacement project. This Total Small Business Set-Aside opportunity involves the full design and construction of approximately 18 trail bridges on the Multi-Use Trail (MUT) within the Sam Houston National Forest, west of New Waverly, TX. The estimated magnitude of construction is between $1,000,000 and $5,000,000. Proposals are due April 17, 2026.

Scope of Work

The project encompasses three main phases:

  • Phase A: Site Investigation and Analysis.
  • Phase B: Design and Construction Document Preparation.
  • Phase C: Removal and disposal of existing crossing infrastructure, construction of new crossings, and connecting trail approaches.

Key requirements include designing bridges with a minimum 72-inch deck width, increased spans, and 18-inch freeboard, considering modular/field-constructable designs and elevated boardwalk structures. The contractor may adopt a phased approach due to the number and varied locations of sites. The project also requires compliance with federal regulations, including the Buy American Act.

Contract & Timeline

  • Contract Type: Firm-Fixed-Price Design-Build construction contract.
  • Period of Performance: 390 calendar days after receipt of Notice to Proceed (NTP).
  • Estimated Magnitude: $1,000,000 - $5,000,000.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 237310 – Highway, Street, and Bridge Construction (Size Standard: $45 million).
  • Response Due: April 17, 2026, by 1300 local time.
  • Questions Due: April 2, 2026.
  • Published Date: March 17, 2026.

Submission & Evaluation

Proposals must be submitted electronically via email to david.l.watson@usda.gov and organized into two volumes: Technical Proposal and Price Proposal. Evaluation will be based on a tradeoff process considering Technical Approach, Relevant Experience, Key Personnel (Project Manager, Design Engineer, Construction Superintendent), Past Performance, and Price. Non-price factors combined are approximately equal to price.

Additional Notes

Offerors are strongly encouraged to visit the project site to familiarize themselves with local conditions. Performance and payment bonds (100% of contract price) are required within 10 calendar days of award. The solicitation includes numerous Federal Acquisition Regulation (FAR) and USDA Acquisition Regulation (AGAR) clauses.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Solicitation
Posted: Mar 17, 2026
Version 1
Pre-Solicitation
Posted: Feb 9, 2026
View
Sam Houston Trail Bridge Replacement | GovScope