SC WACCAMAW NWR RICE TRUNKS REPAIR
SOL #: 140FC126R0008Solicitation
Overview
Buyer
Interior
Us Fish And Wildlife Service
FWS, CONSTRUCTION A/E TEAM 1
Falls Church, VA, 22041, United States
Place of Performance
Place of performance not available
NAICS
Other Heavy and Civil Engineering Construction (237990)
PSC
Construction Of Restoration Of Real Property (Public Or Private) (Y1QA)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Mar 30, 2026
2
Submission Deadline
Apr 27, 2026, 4:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The US Fish and Wildlife Service (Interior) has issued a Solicitation for a Firm Fixed Price construction contract to perform rice trunk repair and related infrastructure work at the Waccamaw National Wildlife Refuge in South Carolina. This opportunity is a Total Small Business Set-Aside with an estimated value between $100,000 and $250,000. Proposals are due April 27, 2026.
Scope of Work
The project, located at Hasty Point Plantation, aims to repair damages to dikes around a 43-acre waterfowl impoundment caused by flooding and hurricanes. Key tasks include:
- Dike Repair: Adding 24 inches of new dirt to 7200 linear feet of dikes.
- Bulkhead Repair/Replacement: Repairing or replacing rotten/broken boards and backfilling around bulkheads.
- Rice Trunk Replacement: Replacing two existing 32ft rice trunks and constructing new 20ft bulkheads for Rice Trunk #1.
- Spillway Box Replacement: Replacing an old spillway box with a new 32ft box.
- Tractor Bridge Work: Repairing three existing tractor bridges and constructing one new one.
- Canal Vegetation Removal: Mechanically removing invasive plant species from 8800 linear feet of interior canals.
- Ditch Cleaning: Cleaning vegetation and sediment from outfall ditches.
- Site Restoration: Removing old equipment and restoring barge landings and accesses.
Contract Details
- Contract Type: Firm Fixed Price
- Estimated Value: $100,000 - $250,000
- Period of Performance: Approximately 180 calendar days after notice to proceed. Work cannot begin before February 9, 2026.
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Applicable Wage Rates: Davis Bacon wage rates (General Decision Number SC20260001) apply, including requirements for Executive Orders 13706 (Paid Sick Leave) and 13658 (Minimum Wage).
Submission & Evaluation
- Proposal Due Date: April 27, 2026, by 12:00 PM EST.
- Questions Due Date: April 13, 2026, by 12:00 AM EST.
- Acceptance Period: 60 days.
- Evaluation Factors: Technical (Compliance), Past Performance, and Price.
- Award Basis: Best Value to the Government.
Special Requirements & Notes
- Site Visit: Highly encouraged. Contact Jason Hunnicutt at jason_hunnicutt@fws.gov or (843) 527-8069 at least 24 hours in advance.
- Bonds: Payment Bond required for awards over $35,000; Payment and Performance Bonds required for awards over $150,000.
- Materials: Rice trunks, spillway box, and bulkhead materials (pilings, sheeting, cribbing, cable) will be provided by the refuge. Contractor is responsible for all other materials and equipment, including barge transport.
- Work Hours: Monday – Friday, 6:00 a.m. to 4:00 p.m. EST.
- Contact: Nelson Crawford, nelson_crawford@fws.gov, (404) 679-4077.
People
Points of Contact
Crawford, NelsonPRIMARY
Files
Versions
Version 1Viewing
Solicitation
Posted: Mar 30, 2026