SCOOP DISC ASSEMBLY
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically NAVSUP WEAPON SYSTEMS SUPPORT MECH, is soliciting quotes for the repair of SCOOP DISC ASSEMBLY (Product Service Code 1285 - Fire Control Radar Equipment, Except Airborne). This is a Solicitation for a bilateral award, requiring contractor acceptance. The Government seeks a Repair Turnaround Time (RTAT) of 278 days, with a price reduction clause for unexcused delays. Quotes are due by May 4, 2026.
Scope of Work
This opportunity covers the repair and quality assurance requirements for the SCOOP DISC ASSEMBLY. Contractors must perform all repair work according to their standard practices, manuals, and directives, ensuring the item meets operational and functional requirements for CAGE 53711, Ref. No. 6736614. Key requirements include:
- Repair of SCOOP DISC ASSEMBLY, including items in unwhole condition, missing hardware, or damaged.
- Adherence to MIL-STD-130, REV N for marking.
- Contractor responsibility for all inspection requirements, with Government Source Inspection (GSI) also required.
- Packaging in accordance with MIL-STD 2073.
Contract & Timeline
- Type: Solicitation (RFQ for repair, resulting in a bilateral award)
- Set-Aside: None specified
- Response Due: May 4, 2026, 8:30 PM EDT
- Published: April 2, 2026, 9:32 PM EDT
Evaluation
Quotes should include unit price, total price, and proposed Repair Turnaround Time (RTAT). Offerors must state their RTAT and provide capacity constraints if unable to meet the Government's 278-day requirement. Pricing must be firm and include all repair-associated costs. A price reduction will be applied for failure to meet the required RTAT due to unexcused contractor delay. Authorized distributors of the original manufacturer's item must provide proof of authorization.
Additional Notes
Freight is handled by the Navy per the Commercial Asset Visibility (CAV) Statement of Work. Accelerated delivery is encouraged. If an item is determined Beyond Repair (BR/BER), a T&E fee/price should be provided, with potential negotiation for a reduced contract price. Offerors must verify nomenclature, part number, and NSN prior to responding.