SCS Phase Shifter Assy
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Defense Logistics Agency (DLA) Aviation at Ogden, UT, under the Department of Defense, is soliciting proposals for 14 Each of SCS Phase Shifter Assy (NSN 6125-00-838-7075). This is a Total Small Business Set-Aside acquisition, restricted to qualified sources, with a requirement for First Article Testing. Quotations are due by April 14, 2026.
Purpose & Scope
This solicitation seeks to procure 14 units of the SCS Phase Shifter Assy (NSN 6125-00-838-7075, P/N: PM66194221/2016817-0501) for the AN/FPS-85 Eglin Radar application. Key requirements include:
- First Article (FA) Testing: Required for specific line items, including submission of a First Article Test Plan (CDRL A001) and a First Article Test Report (CDRL DI-NDTI-80809B).
- Item Unique Identification (IUID): Items must be marked in accordance with MIL-STD-130.
- Packaging & Marking: Compliance with MIL-STD-129 and/or ASTM-D-3951, as detailed in the Statement of Work (SOW). This includes adherence to various military and industry standards for preservation, packaging, and marking for military and commercial shipment, hazardous materials, and electrostatic sensitive devices.
- Supply Chain Traceability: Documentation is required.
- Counterfeit Prevention: A Counterfeit Prevention Plan (CDRL A005) is a required deliverable.
- Engineering Data: An Engineering Data List (EDL) identifies specific drawings (e.g., 2016817, 2018974) furnished with the solicitation. Unmarked engineering data should be treated as "DISTRIBUTION D."
Qualification Requirements
This acquisition is restricted to qualified sources, specifically PHT Aerospace, BT Machine, VPI Technology, and Space Machine and Engineering. Contractors not currently qualified must submit a qualification package as outlined in the Manufacturing Qualification Requirements (MQR) document. The MQR details requirements for facilities, testing capabilities, data verification, manufacture/process verification, and submission of a qualification article. The estimated cost for qualification testing and evaluation is $19,000, with an estimated completion time of 90 days. Qualification does not guarantee contract award, and the award will not be delayed for vendors to meet qualification standards.
Contract Details
- Opportunity Type: Solicitation (RFQ)
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- NAICS Code: 335312 (Electrical Equipment Manufacturing) with a 1,250-employee size standard.
- Contract Type: Implied Firm-Fixed-Price for articles.
- Price Hold: Offered prices must be held firm for 120 days.
- Delivery: "SEE SCHEDULE" with early and partial deliveries acceptable.
- Payment: WAWF (Wide Area Workflow) is required for payment requests.
Submission & Evaluation
- Quotations Due: April 14, 2026, by Close of Business.
- Evaluation: Price or Cost is the most important factor, with all other factors combined being "Significantly Less Important than Cost or Price." The First Article Testing cost (estimated at $20,000) is a factor in evaluation.
- Eligibility: Approved for U.S. Contractors Only.
Contact Information
For inquiries, contact April Blakeley at april.blakeley@us.af.mil.