SD FLAP SDGFP PARKING(1) NORTH POINT PARKING LOT

SOL #: 6982AF26B000002Pre-Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
6982AF CENTRAL FEDERAL LANDS DIVISI
LAKEWOOD, CO, 80228, United States

Place of Performance

Pickstown, SD

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 31, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Highway Administration (Transportation) is presoliciting for the SD FLAP SDGFP PARKING(1) NORTH POINT PARKING LOT project. This project involves the reconstruction of a 98,000 square-foot parking lot in the North Point Recreation Area near Pickstown, South Dakota. The estimated cost for this project is between $2,000,000 and $5,000,000. This opportunity will be solicited using full and open competition procedures.

Scope of Work

The project's scope includes the reconstruction of the pavement within a parking lot servicing the boat ramp in the North Point Recreation Area. Key tasks involve:

  • Removal of existing asphalt and base to a depth of 9.5 inches.
  • Placement of a 3.5-inch asphalt pavement on 6 inches of aggregate base.
  • Subexcavation to remove poor subgrade soils.
  • Minor adjustments to parking lot slopes to create an American Disabilities Act (ADA) compliant handicap parking stall.
  • Installation of a concrete pad for a dumpster, signing, and striping.

The principal work items include:

  • Roadway Excavation: 5,700 CUYD
  • Subexcavation: 3,000 CUYD
  • Roadway Aggregate, Method 2: 3,800 TON
  • Asphalt Concrete Pavement: 2,300 TON

Contract & Timeline

  • Contract Opportunity Type: Presolicitation
  • Set-Aside: Full and Open Competition
  • Estimated Cost Range: $2,000,000 - $5,000,000
  • Anticipated Schedule:
    • Advertisement: March 2026
    • Award: May 2026
    • Notice to Proceed (NTP): June 2026
    • Contract Completion: September 2026

Additional Notes

This is a presolicitation notice; plans and specifications are not yet available. The parking lot will be closed during construction activities. For inquiries, contact Stephanie Navarro or Ryan Phillips at cflcontracts@dot.gov.

People

Points of Contact

Stephanie NavarroPRIMARY
Ryan PhillipsSECONDARY

Files

Files

No files attached to this opportunity

Versions

Version 1Viewing
Pre-Solicitation
Posted: Mar 31, 2026
SD FLAP SDGFP PARKING(1) NORTH POINT PARKING LOT | GovScope