Seed Orchard Irrigation Well

SOL #: 127EAY26Q0076Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA SOUTHWEST 1
Albuquerque, NM, 871023498, United States

Place of Performance

Pollock Pines, CA

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Well Drilling/Exploratory Services (F015)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 13, 2026
2
Submission Deadline
May 23, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting proposals for the installation of a solar-powered irrigation well at the Badger Hill seed orchard admin site on the Placerville Ranger District of El Dorado National Forest in Pollock Pines, CA. This Total Small Business Set-Aside opportunity aims to establish a reliable irrigation system to support thousands of trees suffering from drought. Quotations are due by May 23, 2026, at 5:00 PM ET.

Opportunity Overview

This is a combined synopsis/solicitation (Request for Quotation - RFQ) for a firm fixed-price contract. The project's primary goal is to provide a sustainable water source for the seed orchard, which is critical for its health and productivity.

Scope of Work

The contractor will be responsible for:

  • Drilling a 500-foot well.
  • Installing solar panels and a solar-powered pump within the well.
  • Trenching and laying a water line to fill a government-supplied storage tank.
  • Obtaining the necessary well drilling permit from El Dorado County.
  • Using industry-standard methods and materials, including 4" steel casing, 4" PVC perforated casing, grout pumper, solar components (panels, DC disconnect, wire extension, pump, controller), well wire, well seal, valves, poly pipe, conduit, and associated fittings. Drilling may cease if sufficient water is found before 500 feet, subject to government confirmation.
  • Providing daily verbal (or email) updates on progress.
  • Securing the drilling area by keeping the gate to the fence locked.

Contract Details

  • Contract Type: Firm Fixed Price.
  • Period of Performance: June 1, 2026, to November 30, 2026. Early deliveries are accepted.
  • Place of Performance: Badger Hill seed orchard admin site, Placerville Ranger District, El Dorado National Forest, Pollock Pines, CA 95726.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 237110 (Well Drilling/Exploratory Services), with a $45M size standard.
  • Government Furnished: Water storage tank.

Submission & Evaluation

  • Quotations Due: May 23, 2026, at 5:00 PM ET.
  • Questions Due: May 19, 2026, at 5:00 PM ET, via email to Jasmine Williams (jasmine.williams@usda.gov).
  • Evaluation Criteria: Lowest Price Technically Acceptable (LPTA). Offers will be evaluated on price, technical acceptability (rated as "acceptable" or "unacceptable"), and past performance (rated as "Acceptable," "Neutral," or "Unacceptable").
  • Required Submissions: Offerors must provide detailed explanations of their ability to perform, address any PWS requirements that cannot be met, submit resumes for key personnel (Project Manager), and include signed contingent letters or a staffing plan. A Certificate of Conformance (COC) is also required.
  • Pricing Considerations: Bidders should refer to the Schedule of Items (Mob/Demob, Drilling, Material Costs) for proposal development. Compliance with the Service Contract Act Wage Determination for California is mandatory for labor costs.

Additional Information

Detailed directions and maps to the Badger Hill Orchard and Clone Bank are provided in a separate document, which is essential for site visits and understanding the project's physical layout.

People

Points of Contact

Jasmine WilliamsPRIMARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: May 13, 2026
Seed Orchard Irrigation Well | GovScope