Seeking vendors for Remote Tower Systems (RTS) for the National Airspace System (NAS)

SOL #: 693KA8-26-T-00017Solicitation

Overview

Buyer

Transportation
Federal Aviation Administration
693KA8 SYSTEM OPERATIONS CONTRACTS
WASHINGTON, DC, 20591, United States

Place of Performance

Place of performance not available

NAICS

Other Airport Operations (488119)

PSC

Installation Of Equipment: Alarm, Signal, And Security Detection Systems (N063)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 24, 2026
2
Last Updated
Jun 1, 2026
3
Submission Deadline
Jun 26, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Aviation Administration (FAA) is seeking proposals from qualified vendors for Remote Tower Systems (RTS) for deployment within the National Airspace System (NAS). This Request for Proposal (RFP) aims to identify vendors capable of designing, manufacturing, delivering, installing, and sustaining RTS, with an intent to purchase up to 50 units over a five-year period. The FAA seeks to understand the vendor base, barriers and costs associated with System Design Approval (SDA), and system cost, production, and delivery capacity at scale. Proposals are due June 26, 2026.

Scope of Work

Vendors are required to provide comprehensive RTS solutions that enhance the safety and efficiency of the NAS by replacing traditional Airport Traffic Control Towers (ATCTs) with digital environments. This includes:

  • Designing, manufacturing, delivering, installing, and sustaining RTS.
  • Achieving System Design Approval (SDA) from the FAA.
  • Meeting specific technical requirements for functionality, performance, safety, and security.

Key Requirements

Successful RTS must demonstrate:

  • Technical Performance: Continuous 360-degree airfield view, capture-to-display latency <=1 second, frame rate >=25 Hz, and compliance with FAA human factors standards.
  • Assurance Levels: Software (DO-278A AL 4/5) and hardware (RTCA DO-254 DAL D) assurance.
  • Resilience: Cybersecurity compliance (NIST SP 800-53 Rev. 5 Low baseline), redundancy for 0.999 availability, automatic switchover <=3 seconds, and MTTR <=2 hours.
  • Production Capacity: Ability to produce up to 50 units over a five-year period.
  • System Maturity: Proposals should reflect a fully developed, mature system design, not an R&D effort.

Contract Details

  • Type: Solicitation (RFP), potentially leading to a Memorandum of Agreement (MOA) and then an Indefinite Delivery and Indefinite Quantity (IDIQ) contract after SDA.
  • Quantity: Up to 50 RTS units over five years (contingent, not a commitment).
  • Period of Performance: Five years after SDA completion.
  • Set-Aside: None specified; vendors should identify small business status.

Submission & Evaluation

  • Q&A Due: May 17, 2026, by 5:00 PM EST.
  • Proposal Due: June 26, 2026, by 5:00 PM EST.
  • Submission: Electronic submission in WORD and Excel formats to Saaduddin Khan (Saaduddin.khan@faa.gov).
  • Page Limits: Maximum 37 pages, excluding cover letters and contact information. Title pages, tables of contents, and lists of figures/acronyms count towards the limit.
  • Evaluation: Best value tradeoff approach, with Technical Approach being significantly more important than Cost/Price. Technical criteria are scored on a 1-5 scale (Unacceptable to Outstanding), while cost is scored on a 0-3 scale.
  • Cost Considerations: Standalone RT system cost (hardware + software) should exclude installation and site preparation. 20-year lifecycle costs must be competitive with traditional ATC towers. Vendors are responsible for SDA process costs.

Additional Notes

The FAA will consider various deployment scenarios (1:1 or 1:n). Vendors are not responsible for civil works, site preparation, or RTC facility design/construction, but must include costs for contingency systems (UPS, backup power, HVAC) or note them as sponsor responsibilities.

People

Points of Contact

Saaduddin KhanPRIMARY
Michael LeichtmanSECONDARY

Files

Files

Download
Download
Download

Versions

Version 2Viewing
Solicitation
Posted: Jun 1, 2026
Version 1
Solicitation
Posted: Apr 24, 2026
View
Seeking vendors for Remote Tower Systems (RTS) for the National Airspace System (NAS) | GovScope