Service Air Compressor Replacement

SOL #: FA910126QB018_ServiceAirCompressorCombined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA9101 AEDC PKP PROCRMNT BR
ARNOLD AFB, TN, 37389-1332, United States

Place of Performance

COOPERTOWN, TN

NAICS

Air and Gas Compressor Manufacturing (333912)

PSC

Compressors And Vacuum Pumps (4310)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 13, 2026
2
Last Updated
Apr 6, 2026
3
Submission Deadline
Apr 10, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting quotes for the Service Air Compressor Replacement at AEDC Building 651, Arnold Air Force Base, TN. This Combined Synopsis/Solicitation is a Total Small Business Set-Aside for the procurement, demolition, installation, and commissioning of two (2) 50hp new rotary service air compressors. Quotes are due April 10, 2026, at 10:00 AM (CST).

Purpose

The objective is to restore and improve service air capabilities for test support and tooling across VKF and other supported facilities. The new compressors must maintain current service air requirements of 220 CFM @ 115 psig while enhancing overall performance and efficiency.

Scope of Work

The requirement includes:

  • Procurement and installation of two (2) new 50hp rotary service air compressors, each capable of ≥ 220 CFM at 115 psig.
  • Demolition and removal of two (2) existing service compressors.
  • Initial start-up, operational check-out, and commissioning of the new units.
  • Installation within the existing concrete pad footprint (15'6"x14'5").
  • Vendors are responsible for making electrical connections to the backside of the 480V disconnect for each compressor.
  • Existing piping, isolation valves, desiccant dryers, tanks, filters, and oil water separators will be reused.
  • The Government will provide a 40T overhead crane and/or forklift for lifts and is responsible for the disposal of existing compressors and servicing new ones for warranty purposes.
  • A Quality Control Plan (QCP) is required, and the Government will receive Unlimited Data Rights to all technical data and reports.

Contract & Timeline

  • Type: Combined Synopsis/Solicitation (RFQ), awarded as a purchase order.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS: 333912 (Air and Gas Compressor Manufacturing).
  • Place of Performance: COOPERTOWN, TN (AEDC Building 651).
  • Delivery: Within 3 Months After Receipt of Order (ARO) to Arnold AFB, TN.
  • RFQ Due: April 10, 2026, 10:00 AM (CST).
  • Questions Due: April 8, 2026, 10:00 AM (CST).
  • Published: April 6, 2026.

Submission & Evaluation

Offerors must submit a technical quote/solution, expected delivery date, a statement confirming all-inclusive pricing, and a completed Pricing Worksheet (Attachment 2). Quotes should be emailed to paytonne.szatkowski@us.af.mil and brooke.vandeman@us.af.mil. Award will be made to the technically acceptable quote with the lowest complete and reasonable price. All offerors must be registered in SAM.gov, and the Buy American Act applies. No .zip files are accepted.

Additional Notes

A Virtual Information Exchange presentation and updated Questions and Answers (Attachment 4) are available, including photographs of the work areas.

People

Points of Contact

Paytonne SzatkowskiPRIMARY
Brooke VandemanSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 10Viewing
Combined Synopsis/Solicitation
Posted: Apr 6, 2026
Version 9
Combined Synopsis/Solicitation
Posted: Apr 3, 2026
View
Version 8
Combined Synopsis/Solicitation
Posted: Mar 25, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: Mar 25, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Mar 24, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Mar 24, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Mar 23, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Mar 20, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Mar 18, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 13, 2026
View
Service Air Compressor Replacement | GovScope