Shower Trailer
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
The U.S. Government intends to solicit qualified vendors capable of providing two (2) shower trailer units, each equipped with a minimum of seven (7) enclosed shower heads, to support Korea Rotational Force 17 at the Busan Storage Center. The anticipated period of performance is 17 January 2026 through 28 February 2026, with installation completed no later than 16 January 2026. Contractors will be responsible for providing all personnel, equipment, materials, potable water distribution, grey‑water removal, power generation, climate control, and daily maintenance in accordance with the Performance Work Statement (PWS). This notice is issued solely to identify potential sources capable of meeting the Government’s requirements and to determine interest and capability within the vendor community. The Government may use the results of this notice to refine the acquisition strategy. This is not a request for proposals.
NOTICE TO BE INSERTED IN LOCAL SOURCE REQUIREMENTS: 1. All sources may submit a proposal or quote as applicable. However, the Republic of Korea (ROK)-United States (U.S.) Status of Forces Agreement (SOFA), precludes the U.S. Government from granting Invited Contractor or Technical Representative status to any offeror, for this requirement. All sources submitting a proposal or quote, as applicable, including U.S. sources, must already have, or obtain the requisite business licenses directly from the ROK Government, and conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. Any contractor not already doing business in Korea as a local source, must submit adequate verification in its initial proposal or quote, that it has the requisite authorization and capacity to compete for the requirement as a local source, and to perform the contract as a local source. If an initial proposal does not fully demonstrate this authorization and capacity, it will not be further considered for award. Whether an offeror qualifies as a local source shall be determined by the Contracting Officer. 2. LOCAL CONTRACTORS: The proposed acquisition will be limited to local contractors. All required material, labor, transportation, and facilities and these supply items are available locally. There is nothing inherently difficult about the project that requires the presence of invited contractors. 3. The Price Proposal should be Korea Won.