Single-Module Prefabricated Housing in Yongsan Embassy Housing
SOL #: 19KS7026Q0022-P0001Solicitation
Overview
Buyer
State
State, Department Of
U.S. EMBASSY SEOUL
WASHINGTON, DC, 20520, United States
Place of Performance
Seoul, KR-11, South Korea
NAICS
Prefabricated Wood Building Manufacturing (321992)
PSC
Prefabricated And Portable Buildings (5410)
Set Aside
No set aside specified
Original Source
Timeline
1
Posted
May 20, 2026
2
Submission Deadline
Jun 4, 2026, 8:00 AM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Embassy Seoul has issued Amendment No. 0001 to Solicitation/RFQ 19KS7026Q0022 for Single-Module Prefabricated Housing in Yongsan Embassy Housing, Seoul, South Korea. This amendment provides crucial clarifications and answers to vendor questions, directly impacting proposal preparation. Proposals are due by June 4, 2026.
Scope of Work (Clarified)
This opportunity seeks proposals for single-module prefabricated housing. The amendment clarifies various technical and design requirements:
- Framing: Light-gauge steel or wood-wall panels are acceptable if they meet OBO SME standards for structural and fire safety.
- Restrooms: Plumbing and installation of restrooms are explicitly not within the scope of work.
- Design Submission: The 30% design submission must be comprehensive, including all discipline drawings reflecting core design intent, preliminary renderings, and a finish schedule.
- Dimensions: Minimum interior floor area must be 90m² or larger, with a clear interior ceiling height of at least 3 meters. Vehicle access gate width is 7 meters (height 5.3 meters), and housing compound entry gate width is 3.6 meters.
- Room Configuration: The interior space is to be a continuous open space, with a free-weight zone configured within it.
- Code Compliance: In cases of technical conflict between U.S. and Korean standards, the more stringent code must be applied.
- Electrical Systems: The Embassy uses a 120/208V single-phase, three-wire system; bidders should not install a separate transformer. Electrical panels should be configured as single-phase, three-wire, and all conduits must be concealed. Korean KS-certified products with equivalent performance are permitted for electrical materials.
- Performance Period: The 180-day completion period from Notice to Proceed (NTP) includes the contractor’s design and construction phases, but excludes U.S. Government drawing review periods.
Contract & Timeline
- Type: Solicitation (RFQ 19KS7026Q0022) - Amendment No. 0001
- Set-Aside: None specified
- Product/Service Code: 5410 - Prefabricated And Portable Buildings
- Response Due: June 4, 2026, 08:00 AM KST
- Published Date: May 20, 2026
Contact Information
- Primary: Tina Wong (seoulproposals@state.gov, 8223974000)
- Secondary: Wonyoung Seo (SeoWY@state.gov, 8223974762)
People
Points of Contact
Tina WongPRIMARY
Wonyoung SeoSECONDARY
Files
Files
Versions
Version 1Viewing
Solicitation
Posted: May 20, 2026