Single Tow AFP Head

SOL #: PR454915Combined Synopsis/Solicitation

Overview

Buyer

Energy
Energy, Department Of
ORNL UT-BATTELLE LLC-DOE CONTRACTOR
Oak Ridge, TN, 37831, United States

Place of Performance

Oak Ridge, TN

NAICS

Saw Blade and Handtool Manufacturing (332216)

PSC

Tools And Attachments For Woodworking Machinery (3230)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 25, 2026
2
Submission Deadline
Apr 1, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

Oak Ridge National Laboratory (ORNL), under the Department of Energy, is soliciting proposals for a Single Tow AFP-XS System, a specialized Fiber Placement System. This procurement aims to acquire a system compatible with existing HUMM3 flashlamp technology, configured for thermosets and low-temperature thermoplastics, and includes integration, installation, support, and training. Proposals are due by March 20, 2026, at 12:00 PM EST.

Scope of Work

ORNL requires a comprehensive Single Tow AFP-XS System, including HUMM3 Integration (hardware, software, water-cooled compaction roller), an AddPath Pro License, and Addpath cell environment creation. The system must be compatible with the "humm3 Discovery flashlamp" and designed for thermoset and low-temperature thermoplastic materials. Key deliverables include:

  • A complete AFP-XS system with specific spool dimensions and spare consumables.
  • Control cabinet with external software for offline programming (OLP), HMI, and GUI.
  • On-site installation and integration by two technicians for one week at 2350 Cherahala Blvd. Knoxville, TN.
  • Comprehensive training covering AFP Head operation, robotic use, and maintenance.
  • Successful completion of Site Acceptance Tests (SAT) demonstrating consolidation adjustment, speed control, "flash" capability, and placement accuracy.
  • Required documentation, including an English operational guide.

Contract Details

  • Contract Type: Firm Fixed Price
  • Set-Aside: No Small Business Set-Aside
  • NAICS Code: 332216 - Saw Blade and Handtool Manufacturing (Size Standard: 750 Employees)
  • Place of Performance: Oak Ridge, TN (Installation in Knoxville, TN)
  • Anticipated Subcontract Period: To be determined
  • Offer Validity: 120 days

Submission & Evaluation

Proposals must be submitted in MS Excel, MS Word, or PDF format by March 20, 2026, at 12:00 PM EST. Award will be made on a Lowest Price Technically Acceptable (LPTA) basis. Technical acceptability requires providing the requested products per Attachments A (Bill of Materials) and B (Technical Requirements) with no exceptions. Bidders should note that equivalent products may be acceptable per FAR 52.211-6 Brand Name or Equal.

Key Attachments

Bidders must review all attachments, including:

  • Attachment A (Bill of Materials): Details specific items, quantities, and manufacturer (AddComposites), with fields for pricing and lead time.
  • Attachment B (Technical Requirements): Outlines precise technical specifications, performance, installation needs, and acceptance criteria for the Fiber Placement System.
  • Attachment C (Terms & Conditions): Covers general contractual terms, ES&H, security, and payment.
  • Attachment D (Prime Flowdown Clauses): Lists mandatory FAR/DEAR clauses applicable to subcontracts.
  • Attachment E (Reps & Certs): Requires certifications on business status, export control, Buy American Act, and business size.
  • Attachment F (Technical Data): Defines intellectual property rights and data ownership.

Contact Information

For questions, contact Taylor Hunt at huntmt@ornl.gov or 865-341-3520.

People

Points of Contact

Taylor HuntPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Mar 25, 2026
Single Tow AFP Head | GovScope