Site Preparation and Intact 2-Story Historic Farmhouse Move - Hawley, MN

SOL #: W912ES26RA006Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W07V ENDIST ST PAUL
SAINT PAUL, MN, 55101-1323, United States

Place of Performance

Hawley, MN

NAICS

All Other Specialty Trade Contractors (238990)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 5, 2026
2
Last Updated
May 21, 2026
3
Submission Deadline
Jun 3, 2026, 6:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers – St. Paul District is soliciting proposals for Site Preparation and Intact 2-Story Historic Farmhouse Move in Hawley, MN, as part of the Fargo-Moorhead Metro Flood Risk Management Project. This opportunity is a 100% Small Business Set-Aside. Proposals are due June 3, 2026.

Scope of Work

The awarded contractor will be responsible for:

  • Preparing the site and pouring three concrete foundations at the Pioneer Village site (WMSTR grounds) near Rollag, MN (Hawley, MN).
  • Moving the Bernhardson Farmhouse intact from its current location in Moorhead, MN (13689 3rd St South) to the Rollag site (27512 102nd Ave S, Hawley, MN) and placing it on a foundation. The farmhouse is a 2-story wood-frame structure built in 1874, measuring 28 ft 4 in x 20 ft 10 in.
  • Final site preparation, grading, and seeding.

Contract & Timeline

  • Contract Type: Solicitation
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS: 238990 (All Other Specialty Trade Contractors) with a $19,000,000 size standard.
  • PSC: Z2JZ (Repair or Alteration of Miscellaneous Buildings)
  • Magnitude: Estimated between $1,000,000 and $5,000,000.
  • Response Date: June 3, 2026, by 6:30 PM CDT.
  • Key Dates: The Bernhardson Farmhouse must be moved from Moorhead by the end of the 2026 construction season. Final site restoration and seeding may occur in 2027.
  • Special Consideration: No work is permitted at the WMSTR destination site for the full week preceding and the week following Labor Day weekend 2026, due to the annual Western Minnesota Steam Threshers Reunion.
  • Bonds: Performance and Payment Bonds are required within 10 days of contract award.

Evaluation

Offerors must submit a detailed project timeline, a summary of recent and relevant experience for intact structure moves, past performance references, and a separate price proposal.

Additional Notes

Amendment 0002, posted May 21, 2026, includes the Site Visit Attendance Record for the scheduled site visit held on May 20, 2026. The site visit notice (posted May 13, 2026) detailed logistics, requiring attendees to wear PPE (safety shoes, hard hats) and bring flashlights, and to RSVP by May 18, 2026.

People

Points of Contact

Files

Files

Download
View
View
View
View
View
View
View
View

Versions

Version 5Viewing
Solicitation
Posted: May 21, 2026
Version 4
Solicitation
Posted: May 13, 2026
View
Version 3
Solicitation
Posted: May 7, 2026
View
Version 2
Solicitation
Posted: May 6, 2026
View
Version 1
Pre-Solicitation
Posted: Mar 5, 2026
View
Site Preparation and Intact 2-Story Historic Farmhouse Move - Hawley, MN | GovScope