Sleepy Dog DxP IRSC - Rocky Mountain Restoration Project (RMRP) STEWARDSHIP BPA - San Juan NF, Columbine RD

SOL #: 12363N26Q4101Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, STEWARDSHIP CONTRACTING BRANCH
Washington, DC, 202501138, United States

Place of Performance

Bayfield, CO

NAICS

Logging (113310)

PSC

Tree Thinning Services (F014)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 28, 2026
2
Submission Deadline
May 29, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting quotations (RFQ 12363N26Q4101) for the Sleepy Dog DxP IRSC - Rocky Mountain Restoration Project (RMRP) Stewardship BPA on the San Juan National Forest, Columbine Ranger District in Colorado. This opportunity involves fuels reduction activities and timber removal services. Proposals are due May 29, 2026, at 2:00 PM MD.

Scope of Work

This project aims to enhance public and firefighter safety, improve native wildlife habitat, and restore ecological function and resilience within approximately 242 acres in La Plata County, CO. Key objectives include increasing forest resiliency, age class diversity, promoting vegetation recovery, reducing high-severity wildfire risk, and providing wood products.

The scope includes:

  • Mandatory: Cutting and removing included sawtimber (approx. 242 acres).
  • Optional: Processing and decking approximately 75% of topwood biomass from harvested sawlog trees.
  • Timber Removal: Live Ponderosa Pine Sawtimber (estimated 1532 CCF) with a minimum acceptable offer of $3.00 per CCF.
  • Associated Activities: Felling, bucking, skidding, yarding, scaling, and slash disposal.
  • Road Maintenance: Contractor is responsible for all pre, during, and post-haul road maintenance on specified National Forest Service Roads (NFSR) and County Roads (CR) per Appendix C, without additional compensation.

Contract Details

  • Contract Type: Firm Fixed Price BPA Call Order against the R2 Rocky Mountain Restoration Project BPA.
  • Period of Performance: From date of award through November 30, 2029.
  • Set-Aside: Total Small Business Set-Aside.
  • NAICS Code: 113310 (Timber Tract and Forest Nurseries) with a 500-employee size standard.
  • Place of Performance: San Juan National Forest, La Plata County, Bayfield, CO.

Submission & Evaluation

  • Submission: Technical and price proposals must be submitted separately via email to keith.r.brugger@usda.gov. No hard copy documents.
  • Offer Due Date: May 29, 2026, 2:00 PM MD.
  • Proposal Validity: Proposals must be valid for 60 days.
  • Evaluation Criteria: Proposals will be evaluated based on Technical Approach (most important), Relevant Past Performance, and Utilization of Local Work Forces/Benefit to Local Community. Cost/Price will also be a factor.
  • Site Visit: A pre-proposal conference and site visit are scheduled for Wednesday, May 13, 2026, at 9:00 AM at the San Juan N.F. Supervisors Office, Durango, CO. Offerors are urged to inspect the site.

Special Considerations

  • Operational Restrictions: Hand-thinning and mechanical treatments are prohibited between December 1st and April 30th due to big game winter habitat and other conditions.
  • Performance Standards: A minimum Acceptable Quality Level (AQL) of 90% is required for both mandatory and optional items. Work quality below 85% may result in reduced payment or termination.
  • Wage Determination: The Service Contract Act (SCA) Wage Determination No. 2015-5435, Revision 29 applies, outlining minimum wage rates and fringe benefits for specified Colorado counties. Bidders must ensure compliance.
  • Maps: Detailed Contract Area and Logging Plan Maps (Appendices 04.1 and 04.2) are provided, illustrating cutting units, access routes, protected areas, and operational constraints.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Apr 28, 2026
Sleepy Dog DxP IRSC - Rocky Mountain Restoration Project (RMRP) STEWARDSHIP BPA - San Juan NF, Columbine RD | GovScope