Small Business Set Aside Brand Name or Equal for 2 Lithium Battery Storage/Charging Container per attachments

SOL #: N61331-26-Q-KS17Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVAL SURFACE WARFARE CENTER
PANAMA CITY BEACH, FL, 32407-7001, United States

Place of Performance

Panama City Beach, FL

NAICS

Prefabricated Metal Building and Component Manufacturing (332311)

PSC

Prefabricated And Portable Buildings (5410)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 22, 2026
2
Last Updated
Feb 11, 2026
3
Submission Deadline
Jan 29, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, Naval Surface Warfare Center (NSWC), is soliciting proposals for the fabrication and delivery of two (2) Lithium Battery Storage/Charging Containers. This Total Small Business Set-Aside opportunity requires "Brand Name or Equal" solutions compliant with specific technical and safety standards. The containers are for the Naval Support Activity in Panama City, FL. Quotes are due by January 29, 2026, at 9 AM Central Time.

Scope of Work

The contractor will fabricate and deliver two MILVAN/Lithium Battery Storage/Charging Containers. These containers must adhere to best practices for lithium battery storage, including robust ventilation, fire suppression, temperature control, and emergency response measures. Key design considerations include a 4-hour exterior and 1-hour roof fire rating, 150 MPH wind load, and seismic category C. The containers must incorporate systems such as static grounding, explosion-proof exhaust, fire alarm, dry chemical fire suppression, water sprinkler, and a heat pump mini-split. All steel used must be highest grade American-made, and welding must comply with AWS and ASTM standards.

Contract Details

  • Opportunity Type: Combined Synopsis/Solicitation
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: 5410 - Prefabricated And Portable Buildings
  • Place of Performance: Naval Support Activity, Building 100, 110 Vernon Avenue, Panama City, FL 32407-7001
  • Period of Performance: From date of award until 180 days after purchase order award.

Key Requirements & Clarifications

  • Technical Compliance: Buildings must meet UFC 3-520-05 requirements for lithium battery storage. Detailed specifications for "Brand Name or Equal" solutions are provided, covering structural, system, and accessory requirements (UL, ASTM, IBC, NAAMM standards).
  • Submission: Quotes must be on company letterhead, include full specifications, CAGE code, and lead time. Email quotes to kaitlin.h.summerville.civ@us.navy.mil. Late quotes will not be accepted.
  • Payment: Contractors must be able to invoice through Wide Area Workflow (WAWF). Shipping costs, if not included in the price, should be a separate line item.
  • Reporting: A Contract Data Requirements List (CDRL) specifies a "Work Summary Report" (Data Item No. A001) due within five days after construction completion, submitted as a signed PDF via email.
  • Contract Clauses: Bidders must review comprehensive FAR and DFARS clauses covering various aspects, including cybersecurity, small business concerns, and commercial items.

Evaluation Factors

Award will be based on the Best Value to the government, considering Price, Delivery, Quality, and Past Performance.

Timeline & Contact

People

Points of Contact

Kaitlin SummervillePRIMARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 5
Award Notice
Posted: Feb 11, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Jan 29, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: Jan 28, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Jan 22, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Jan 22, 2026
View