Solicitation for the Overhaul of the Computer, Flight Control for the UH-60 Black Hawk

SOL #: W58RGZ-25-R-0079Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QK ACC-RSA
REDSTONE ARSENAL, AL, 35898-0000, United States

Place of Performance

Redstone Arsenal, AL

NAICS

Search (334511)

PSC

Automatic Pilot Mechanisms And Airborne Gyro Components (6615)

Set Aside

No set aside specified

Timeline

1
Posted
Jan 15, 2026
2
Submission Deadline
Jan 30, 2026, 11:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, ACC-RSA is soliciting proposals for the overhaul of Computer, Flight Control units (NSN: 6615-01-573-7644) for the UH-60 Black Hawk. This will be a Five (5) year, Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) contract. Proposals are due January 30, 2026, at 5:00 PM CST.

Scope of Work

The contractor shall furnish all services, labor, parts, materials, equipment, tools, and data necessary to accomplish the overhaul of Computer, Flight Control units. Key requirements include:

  • Overhaul of Computer, Flight Control units (NSN: 6615-01-573-7644, P/N: 100-602542-001).
  • Conducting a Product Verification Audit (PVA) for three (3) units within 90 days of receiving reparables.
  • Submission of a Maintenance and Overhaul (M&O) Plan within 30 days after contract award.
  • Compliance with MIL-STD-2073-1E for preservation and packaging, and MIL-STD-129R for marking.
  • Adherence to TAMMS-A reporting requirements and DFARS clauses related to technical data and computer software.
  • Management of Government Furnished Property (GFP), including unserviceable assets, and providing inventory reports.

Contract Details

  • Contract Type: Firm-Fixed-Price (FFP) Indefinite Delivery, Indefinite Quantity (IDIQ) Maintenance and Overhaul.
  • Period of Performance: Five (5) years.
  • Estimated Quantity Range: Minimum 168 units, Maximum 605 units (including 101 for Foreign Military Sales (FMS)).
  • Set-Aside: None specified.
  • Known Source: Currently, the only known source is Canadian Commercial Corporation, a Large Business.
  • Funding: This requirement is currently unfunded; award will be withheld pending receipt of sufficient funds.
  • FOB: Origin.
  • Commerciality: Not commercial; FAR Part 12 will not be utilized.
  • Criticality: Not a Critical Safety Item (CSI). No Depot Maintenance Work Requirement (DMWR) available.

Submission & Evaluation

  • Proposal Submission: Electronic submission only via email to andrew.e.cameron.civ@army.mil and lindy.l.pinchon.civ@army.mil. No fax or hard copy responses will be accepted.
  • Proposal Due Date: January 30, 2026, at 5:00 PM CST.
  • Proposal Acceptance Period: 120 days from the deadline for receipt of proposals.
  • Procedure: Procurement will follow FAR Part 15 procedures.

Key Attachments & CDRLs

Bidders should review attachments for detailed requirements:

  • Attachment 0001 - MO Packaging Requirements: Specific packaging, marking, and material requirements (MIL-STD-2073-1, MIL-STD-129).
  • Attachment 0002 - Document Summary List: References various data items, reports, and standards from the SOW.
  • Attachment 0003 - Contractor Overhaul TAV-C Requirements: Details access and data exchange requirements for the Army's Total Asset Visibility – Contractor (TAV-C) system.
  • Attachment 0004 - GFP.xlsx: Lists Government Furnished Property, including 168 serially managed 'Computer, Flight Control' units as unserviceable assets.
  • CDRL A001 (GP Inventory Report): Initial inventory due 365 days after GFP receipt, then annually.
  • CDRL A002 (Shipping Supply Discrepancy Report): Required for shipment discrepancies.
  • CDRL A003 (M&O Process Plan): Due 30 days after contract award.
  • CDRL A004 (TAMMS-A Logistics Product Data): Required as needed, submitted via PIEE/WAWF or TAMMS-A/MCDS portal.

Additional Notes

Government Furnished Materials (GFM) will not be provided, other than the reparable assets themselves. Access to DLA FedMall is NOT authorized. Specific DFARS clauses regarding Rights in Technical Data and Computer Software have been updated (Aug 2025 versions).

People

Points of Contact

Andrew E. CameronPRIMARY
Lindy L. PinchonSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Solicitation
Posted: Jan 15, 2026
Solicitation for the Overhaul of the Computer, Flight Control for the UH-60 Black Hawk | GovScope