Solicitation: Preventive maintenance of Chiller equipment systems

SOL #: 19TC1026R0001Solicitation

Overview

Buyer

State
State, Department Of
US EMBASSY ABU DHABI
WASHINGTON, DC, 20520, United States

Place of Performance

Place of performance not available

NAICS

All Other Support Services (561990)

PSC

Other Quality Control, Testing And Inspection Services: Fire Fighting, Rescue, And Safety Equipment; And Environmental Protection Equipment And Materials (H942)

Set Aside

No set aside specified

Timeline

1
Posted
Jan 12, 2026
2
Last Updated
Jan 28, 2026
3
Submission Deadline
Feb 11, 2026, 12:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Embassy in Abu Dhabi has issued a Solicitation (19TC1026R0001) for Preventive Maintenance Services for Chiller Equipment Systems. This opportunity seeks a competent contractor to maintain chiller equipment in safe, reliable, and efficient operating condition. The contract is a Firm Fixed-Price type, with a base year and four one-year option periods. Proposals are due by February 11, 2026, at 4:00 pm (UAE time).

Scope of Work

The contract covers scheduled annual maintenance services for specified York and Trane chillers at the U.S. Embassy in Abu Dhabi. Services include inspection, maintenance, and adjustments according to manufacturer specifications. The contractor must provide all necessary personnel, transportation, equipment, tools, and consumable parts, including inventory, supply, and replacement of expendable parts (e.g., filters, hoses, O-rings). Proper disposal of used oil and toxic substances is also required. Importantly, repairing and/or replacement of parts are not covered under this contract and would require separate quotes/Purchase Orders. Subcontracting the entire service is not authorized.

Contract Details

  • Contract Type: Firm Fixed Price
  • Period of Performance: One base year (anticipated April 15, 2026 - April 14, 2027) with four one-year optional periods.
  • Payment Currency: Arab Emirate Dirham (AED). VAT will be priced as a separate line item.
  • Insurance: Offerors must account for UAE Workmen's Compensation Plan (WCP) for UAE-licensed companies and include an estimated quote for Defense Base Act (DBA) insurance for civilian employees working outside the U.S.

Submission & Evaluation

  • Proposal Due Date: February 11, 2026, at 4:00 pm (UAE time).
  • Submission Method: Electronically to AbuDhabiContracts@state.gov, with a copy to JohnJM@state.gov. Proposals must be in English, PDF format, and not exceed 10MB per email.
  • Evaluation: Award will be made to the lowest price, technically acceptable responsible offeror. Evaluation factors include technical acceptability (past performance, experience, technical information) and offeror responsibility (financial resources, SAM registration, ability to comply, integrity, organization, experience, skills, equipment, facilities, and eligibility).
  • Required Documents (Key items from checklist): SF-1449, Pricing Table, Project Manager information (5+ years York/Trane Chiller PM experience), proof of active SAM registration (UEI, CAGE code), past performance (5+ chiller PM services in past 3 years), personnel training certificates, tools/equipment list, Authorized Service Provider Certification (Johnson Controls or Trane), commercial license, Work Plan, Quality Plan, confirmation of consumables/spare parts supply, Workmen Compensation Insurance, past three years' audited financial statements, and Section 5 Representations and Certifications.

Key Requirements for Offerors

  • SAM Registration: Active SAM registration is mandatory prior to submission.
  • Project Manager: Must have at least five years of experience managing York/Trane Chiller PM Service teams and troubleshooting expertise, with English proficiency.
  • Certifications: Valid Authorized Service Provider Certification from Johnson Controls or Trane Chiller Manufacturer.

Contact Information

People

Points of Contact

Gregory StonebergPRIMARY
Joseph M JohnSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Solicitation
Posted: Jan 28, 2026
Version 1
Solicitation
Posted: Jan 12, 2026
View
Solicitation: Preventive maintenance of Chiller equipment systems | GovScope