Solicitation: U.S. Flags and Presentation Boxes

SOL #: W9124J26RFLAGCombined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QM MICC-FDO FT SAM HOUSTON
FORT SAM HOUSTON, TX, 78234-1361, United States

Place of Performance

San Antonio, TX

NAICS

All Other Miscellaneous Textile Product Mills (314999)

PSC

Flags And Pennants (8345)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 29, 2026
2
Last Updated
Feb 20, 2026
3
Submission Deadline
Feb 25, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army's Mission and Installation Contracting Command – Fort Sam Houston (MICC-FSH), on behalf of IMCOM G1, is soliciting proposals for U.S. National Flags and Presentation Boxes under Solicitation W9124J-26-R-FLAG. This is a 100% Small Business Set-Aside for a Single-Award Indefinite-Delivery/Indefinite-Quantity (IDIQ) Firm-Fixed-Price (FFP) contract. The requirement includes associated services for quarterly distribution to over 59 Army installations, a tracking system, and reporting. Proposals are due Wednesday, 25 February 2026, at 12:00 PM Central Time.

Scope of Work

The contractor shall provide 3' x 5' U.S. National Flags and custom Presentation Boxes. Flags must be heavyweight 200 Denier nylon with embroidered stars and sewn stripes, compliant with Federal Specification DDD-F-416F, AR 840-10, and TIOH standards for colors. Presentation boxes are full-color, 'Tuck-Top' mailer style (approx. 10" x 12" x 2") made of E-Flute Corrugated Fiberboard with specific laminate finishes and graphics, including the Army Retired Lapel Button graphic on the insert. Services include developing a tracking system and providing quarterly delivery reports for distribution to 59+ Army installations.

Key Requirements

A mandatory qualification is that flags and their components must be 100% Berry Amendment-compliant ("Made in the USA"). Offerors must also comply with the Non-Manufacturer Rule (NMR). A preliminary digital mock-up (PDF) of the presentation box exterior and interior insert is required within five (5) business days after contract award. Delivery is required no later than 30 Days After Receipt of Order (ARO) to various CONUS and OCONUS locations, with an estimated annual quantity of 42,318 units. Packaging must adhere to specific standards, including double-wall corrugated fiberboard master cases not exceeding 40 lbs.

Contract Details

This will be a Single-Award IDIQ FFP contract with an ordering period of 5 years (60 months) from the date of contract award, anticipated from April 1, 2026, to March 31, 2031. The contract has a minimum of 200 units and a cumulative maximum of 211,590 units.

Submission & Evaluation

Quotes must be submitted in three separate volumes: General (Administrative), Technical Capability, and Price. Award will be based on Best Value, considering Technical Capability (Factor I), Past Performance (Factor II), and Price (Factor III). Technical and Past Performance are approximately equal and combined are approximately equal to Price. The Government intends to evaluate quotes and award without further communication. Bidders must use Attachment 05 - Solicitation Exceptions Table to formally declare and justify any deviations from requirements.

Contacts

For inquiries, contact Jacquelyn Morgan at jacquelyn.k.morgan.civ@army.mil or Ralph M. Bowie at ralph.m.bowie.civ@army.mil.

People

Points of Contact

Jacquelyn MorganPRIMARY
Ralph M. BowieSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Combined Synopsis/Solicitation
Posted: Feb 20, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Feb 12, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Jan 29, 2026
View
Solicitation: U.S. Flags and Presentation Boxes | GovScope