Soo Poe Lock Gate 3 Fabrication and Delivery

SOL #: W911XK26BA022Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W072 ENDIST DETROIT
DETROIT, MI, 48226-5000, United States

Place of Performance

Place of performance not available

NAICS

Fabricated Structural Metal Manufacturing (332312)

PSC

Iron And Steel Primary And Semifinished Products (9640)

Set Aside

No set aside specified

Timeline

1
Posted
May 11, 2026
2
Submission Deadline
Jun 11, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, W072 ENDIST DETROIT, has issued a Solicitation for the fabrication and delivery of one replacement Miter Gate 3 for the Poe Lock located at the Soo Locks Complex, St. Marys River, Sault Ste. Marie, MI. This critical infrastructure project ensures the continued operation of the Soo Locks. Proposals are due June 11, 2026.

Scope of Work

The work primarily consists of the fabrication and subsequent delivery of a single replacement Miter Gate 3. This gate is intended for installation at the Poe Lock within the Soo Locks Complex. Bidders should note that this solicitation includes restricted project drawings and specifications, which are considered Controlled Unclassified Information (CUI). Detailed instructions for requesting access to these essential documents are provided within the "Instructions to Bidders" section of the solicitation.

Contract & Timeline

  • Type: Solicitation
  • Product Service Code: 9640 (Iron And Steel Primary And Semifinished Products)
  • Set-Aside: None specified
  • Response Due: June 11, 2026, 6:00 PM ET
  • Published: May 11, 2026, 6:00 PM ET

Additional Notes

Prospective bidders must carefully review the solicitation's "Instructions to Bidders" for comprehensive details on accessing the Controlled Unclassified Information (CUI) related to project drawings and specifications. Failure to follow these instructions may impact a bidder's ability to prepare a complete and compliant proposal.

People

Points of Contact

Files

Files

View
View
View
View

Versions

Version 1Viewing
Solicitation
Posted: May 11, 2026