Sources Sought Notice, Design-Build Construction: Unheated Warehouse Facility, Guam Army National Guard

SOL #: GUARNGCFMOPN140009Sources Sought

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W7QP USPFO ACTIVITY GU ARNG
BARRIGADA, GU, 96913, United States

Place of Performance

Place of performance not available

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Other Warehouse Buildings (Y1GZ)

Set Aside

No set aside specified

Timeline

1
Posted
Jun 3, 2025
2
Last Updated
Jun 6, 2025
3
Response Deadline
Jun 30, 2025, 3:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

This is a Sources Sought Notice issued solely for market research and planning purposes. The USPFO for Guam Purchasing and Contracting Division, is conducting a market survey to determine if there is a reasonable number of qualified small business concerns capable of performing the following construction requirement.

This requirement is for the Design-Build construction of an unheated warehouse facility totaling 6,120 square feet. The structure is a non-standard designed Organizational Storage Building of permanent construction. It will be designed to meet industry standards and comply with all applicable local, state, and federal building codes, including 42 U.S. Code 4154. Construction includes all utility services information systems fire detection and alarm systems roads walks curbs gutters storm drainage parking areas and other site improvements. The facility must be designed for a minimum life of 50 years per the Department of Defense Unified Facilities Code UFC 1-200-02 and include sustainability features in accordance with the ASA IE E Sustainable Design and Development Policy dated 2017. The project will incorporate accessible design features for individuals with disabilities and provide Antiterrorism Force Protection measures in compliance with DoD standards. The facility must also be designed and constructed to achieve LEED Silver certification. This facility serves as a direct replacement and complies with the 1-for-1 square footage disposal requirement.

Contract Duration: 900 calendar days

Construction Magnitude: Between $1,000,000 and $5,000,000

Submission Instructions Interested small businesses (including Small Business, 8(a), HUBZone, Woman-Owned Small Business WOSB, Service-Disabled Veteran-Owned Small Business SDVOSB, or other are encouraged to submit a completed Vendor Capabilities Statement form.

Responses should include:

1. Company name, address and Unique Entity Identifier UEI CAGE code

2. Business classification (e.g., 8(a), HUBZone, etc.)

3. Point of contact information

4. Statement of interest and relevant project experience

5. Bonding capacity (single and aggregate)

6. Completed and signed Capabilities Statement form

Response Due Date: Monday, June 30, 2025, 1300 K1+10

Submit To:

Contract Specialist: Joseph S. Mafnas, joseph.s.mafnas.civ@army.mil

Contracting Officer: Maelani T. Ellison, maelani.t.ellison.civ@army.mil

This is not a Request for Proposals. Responses will assist the Government in determining the appropriate acquisition strategy, including whether a small business set-aside is feasible.

See Attachments/Links: Click on PIEE Solicitation Module Link for GUARNGCFMOPN140009 to download the Sources Sought Notice and Vendor Capabilities Statement Form from the PIEE Solicitation Module. 

People

Points of Contact

Files

Files

View
View
View
View

Versions

Version 7
Sources Sought
Posted: Jun 6, 2025
View
Version 6
Sources Sought
Posted: Jun 3, 2025
View
Version 5
Sources Sought
Posted: Jun 3, 2025
View
Version 4
Sources Sought
Posted: Jun 3, 2025
View
Version 3Viewing
Sources Sought
Posted: Jun 3, 2025
Version 2
Sources Sought
Posted: Jun 3, 2025
View
Version 1
Sources Sought
Posted: Jun 3, 2025
View