Sources Sought Notice for NIST Multiple Coils Replacement

SOL #: OFPM_TEAM_SS26_14Sources Sought

Overview

Buyer

Commerce
National Institute Of Standards And Technology
DEPT OF COMMERCE NIST
GAITHERSBURG, MD, 20899, United States

Place of Performance

Gaithersburg, MD

NAICS

Plumbing (238220)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Plumbing, Heating, And Waste Disposal Equipment (J045)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 21, 2026
2
Response Deadline
Apr 28, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Department of Commerce, National Institute of Standards and Technology (NIST) has issued a Sources Sought Notice to gather information from industry regarding the replacement of cooling and heating coils in Building 227 at the NIST Gaithersburg, MD campus. This is for market research purposes only and is not a solicitation. Responses are due by April 28, 2026, at 1:00 PM EST.

Scope of Work

NIST is seeking a contractor to replace multiple cooling and heating coils in Building 227, which are beyond their expected lifespan, to ensure the HVAC system maintains temperature setpoints. The scope includes:

  • Cooling Coils: Replacement of 4 cooling water coils in air handling unit AHU-1-1 and associated piping.
  • Heating Coils: Replacement of 36 heating hot water coils across multiple air handling units (AHU-1-1, AHU-1-2, AHU-2-1, AHU-2-2, AHU-3-1, AHU-3-2, AHU-4-1, AHU-4-2, AHU-6-1, AHU-6-2, AHU-7-1, AHU-7-2).
  • Ancillary Work: Replacement of associated piping connections, insulation, field verifications, and air/water system testing and balancing.
  • Compliance: All work must adhere to Federal, State, Local requirements, IBC, ASHRAE Design Guide, and other applicable codes.

Contract & Timeline

  • Type: Sources Sought / Request for Information (RFI)
  • Anticipated Period of Performance: Six (6) months from the Notice to Proceed.
  • Set-Aside: None specified (market research for small and other than small businesses).
  • Product Service Code: J045 (Maintenance, Repair And Rebuilding Of Equipment: Plumbing, Heating, And Waste Disposal Equipment).
  • Response Due: April 28, 2026, 1:00 PM EST.
  • Published: April 21, 2026.

Submission & Evaluation

Interested industry sources should submit responses via email to Brandon Butler (brandon.butler@nist.gov). Submissions must be in Microsoft Word or PDF, use 12-point font, and be limited to ten pages (excluding cover page and commercial pricing). Responses should include:

  • Company information, Unique Entity ID, POC, website, and SAM.gov registration status.
  • Validation of company size status under NAICS 236220 (Commercial and Institutional Bldg. Construction).
  • Suggestions for improving the draft SOW and suggested evaluation factors.
  • Standard commercial pricing information (if available) and an optional estimate for SOW requirements.
  • Details on the company's safety program, compliance with DOT/other regulations, and ability to complete SOW tasks.
  • For small businesses, confirmation of compliance with FAR clause 52.219-14, Limitations on Subcontracting.
  • Information on GSA Multiple Award Schedule contracts or other federal contracts.

Additional Notes

This notice is for market research only; NIST is not obligated to award a contract. Respondents must be registered in SAM.gov. The contractor will need to provide a Prime Contractor Superintendent on-site at all times work is performed. Strict security and site access procedures, including pre-registration for non-Government employees and vehicle inspections, are detailed in the attached 'Guidelines for Contractors and A&E firms'. Daily reports to the COR are required. Do not include proprietary, classified, or sensitive information.

People

Points of Contact

Brandon ButlerPRIMARY

Files

Files

Download
Download
Download

Versions

Version 1Viewing
Sources Sought
Posted: Apr 21, 2026
Sources Sought Notice for NIST Multiple Coils Replacement | GovScope