Sources Sought PinPoint II Maintenance
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
**THIS IS A SOURCES SOUGHT ONLY, ANY COORESPONDANCE IS STRICTLY FOR MARKET ANALYSIS** Please indicate if your company is willing and capabile to perform PinPoint II Systems maintenance IAW with attached DRAFT Performance Work Statment (PWS). All work shall be done in accordance with manufacturer’s specifications and in coordination with the Ellsworth AFB Maintenance Group (28 MXG).
Please email A1C Trent Waterman at trent.waterman@us.af.mil and Timeaki McPhee at timeaki.mcphee@us.af.mil if willing and capable of satisfying this requirement. Include your companies CAGE code and any active GSA contract numbers in all correspondence