Sources Sought to Sole Source- Redstone Arsenal Airfield MG – Electric Power, Photovoltaic Project (Switchgear)

SOL #: W912QR-26-ERCIP-RSA3Sources SoughtSole Source

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W072 ENDIST LOUISVILLE
LOUISVILLE, KY, 40202-2230, United States

Place of Performance

Huntsville, AL

NAICS

Power and Communication Line and Related Structures Construction (237130)

PSC

Construction Of Other Utilities (Y1NZ)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 8, 2026
2
Response Deadline
Apr 22, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers (USACE) Louisville District is conducting a Sources Sought to identify interested parties capable of meeting the requirements for the Redstone Arsenal Airfield Microgrid – Electric Power, Photovoltaic Project in Huntsville, AL. This notice specifically highlights an intent to include a sole-source brand name requirement for G&W switchgear in the upcoming construction solicitation. Capability statements are due by April 22, 2026.

Scope of Work

This Sources Sought is for the construction of the Redstone Arsenal Airfield Microgrid – Electric Power, Photovoltaic Project. A key component of the future construction contract solicitation will be a sole-source brand name requirement for G&W switchgear model PR40-378-12-40FB with SEL relays. Interested parties who believe they can meet this requirement are invited to submit a capability statement.

Contract & Timeline

  • Type: Sources Sought / Market Research
  • Set-Aside: None specified
  • Response Due: April 22, 2026, 1:00 PM ET
  • Published: April 8, 2026

Evaluation

Capability statements will be reviewed by USACE to determine if interested parties can meet the described requirements, particularly concerning the specified sole-source brand name component.

Additional Notes

This is not a solicitation for competitive proposals. It is for informational and planning purposes only. All submissions must be in writing and contain sufficient detail to demonstrate capability.

People

Points of Contact

Files

Files

No files attached to this opportunity

Versions

Version 1Viewing
Sources Sought
Posted: Apr 8, 2026
Sources Sought to Sole Source- Redstone Arsenal Airfield MG – Electric Power, Photovoltaic Project (Switchgear) | GovScope