Spares: B-2 Hose Assembly, Non-metallic NSN: 4720-01-362-3482FW
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The United States Air Force Sustainment Center (AFSC) at Tinker AFB is soliciting proposals for a Firm-Fixed Price (FFP) Indefinite-Delivery Requirements contract for the supply of the B-2 Hose Assembly, Non-metallic (NSN: 4720-01-362-3482FW). This opportunity is not set aside for small businesses, as two or more capable small businesses were not identified. Proposals are due June 4, 2026, at 1:00 PM (CST).
Scope of Work
The requirement is for the supply of B-2 Hose Assembly, Non-metallic, Part Number DAA3515A011-019, used in the forward environmental control system of the B-2. The solicitation includes six line items:
- Line Item 0001: 9 units of Hose Assembly, Non-metallic, with a proposed delivery of April 3, 2028.
- Line Item 0002: 1 unit of Hose Assembly, Non-metallic - First Article, also due April 3, 2028.
- Line Items 0003-0005: First Article Test Report, Certificate of Compliance, and Material Certification, each 1 unit, due January 1, 2027.
- Line Item 0006: 1 unit for Non-Recurring Engineering (NRE), due March 27, 2027.
Contract Details
- Contract Type: Firm-Fixed Price (FFP) Indefinite-Delivery Requirements Contract.
- Solicitation Number: FA8119-26-Q-0002.
- Set-Aside: None (unrestricted).
- Period of Performance: From contract award date until Government acceptance of supplies.
- Place of Performance: Tinker AFB, OK.
Key Requirements
- First Article Testing: A First Article is required (1 unit) and will undergo both contractor and government testing. A First Article Test Report (DD Form 1423 ELIN) is mandatory, due January 1, 2027. First Article testing will not be waived.
- Packaging: All items must comply with specific packaging requirements, including United Nations restrictions on Wood Packaging Material (WPM) (debarked, heat-treated, ALSC certified) and military standards MIL-STD-129 and MIL-STD-2073-1.
- Transportation: Transportation data is detailed in DD FORM 1653, specifying F.O.B. Origin terms. Bidders must contact DCMA Transportation for shipping instructions and regulatory clearances.
- Quality Assurance: Higher Level Contract Quality Requirements (ISO 9001-2015, AS9100) are specified.
Submission & Contact
- Proposal Due Date: June 4, 2026, at 1:00 PM (CST). This date was extended by Amendment P0001.
- Submission Method: Electronic procedures will be used. Written responses are required.
- Questions: All questions must be submitted in writing via email to the contacts below. Vendor identities will not be disclosed.
- Contacts: Caleb Taylor (Contract Specialist, caleb.taylor.8@us.af.mil) and Jonathan Payne (Contracting Officer, jonathan.payne.11@us.af.mil).
- Ombudsman: An Ombudsman is available at 405-736-3273 for concerns during proposal development.
Additional Notes
Three approved sources are listed: The Boeing Company, Northrop Grumman Systems Corporation, and ITL Solutions LLC. Offerors must specify their business size and U.S./foreign-owned status in their response.