Specialized technical support services to enhance the DON’s energy, water, and other services to meet emerging technologies
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy (DON), specifically NAVSUP FLT LOG CTR NORFOLK, has issued a Justification for Other Than Full and Open Competition to extend an existing Purchase Order (N00189-25-P-Z252) with The Meridian Group DC, LLC. This extension is for specialized technical support services aimed at enhancing the DON’s energy, water, and other services to meet emerging technologies. The purpose is to ensure the continued performance of ongoing mission-critical work streams.
Scope of Change
This Justification extends the base period of performance for Purchase Order N00189-25-P-Z252 from eight (8) months to eleven and one half (11.5) months. The extension will push the period of performance through June 15, 2026. There is no change to the scope of work; the modification is solely for extending the period to ensure uninterrupted completion of existing requirements.
Contract & Timeline
- Type: Justification for Other Than Full and Open Competition (Simplified Acquisition Procedures – Commercial Items)
- Existing Contract: Purchase Order N00189-25-P-Z252 with The Meridian Group DC, LLC
- Extension Period: Through June 15, 2026
- Set-Aside: None specified (Justification for existing contract)
- Published: January 29, 2026
Additional Notes
This modification does not represent a new or expanded need. Competition will be pursued for future requirements as appropriate. The contracting officer will determine that the pricing associated with the extended period of performance is fair and reasonable prior to modification.