Spiral Antenna
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Naval Air Warfare Center Weapons Division (NAWCWD) at China Lake, CA, intends to procure 12 Spiral Antennas on a sole-source basis from JEM Engineering. This notice is not a request for competitive proposals, but firms believing they can fulfill the requirement may submit a capability statement. Responses are due March 2, 2026.
Scope of Work
This requirement is for the direct replacement of existing Spiral Antennas, with a quantity of 12 units. The procurement is intended to be sole-sourced to JEM Engineering, located at 8683 Cherry Lane, Laurel, MD 20707.
Contract & Timeline
- Type: Presolicitation / Notice of Intent (Sole Source)
- Set-Aside: None
- Response Due: March 2, 2026, by 3:00 PM PST (5 days after publication)
- Published: February 25, 2026
- Sole Source To: JEM Engineering
- Product Service Code: 5985 (Antennas, Waveguide, And Related Equipment)
Submission Requirements
Firms interested in demonstrating their capability must submit a written response to miranda.m.zamarron.civ@us.navy.mil. The response must reference PMT number N68936-26-SIMACQ-D520000/E520000-0060 and include a capability statement detailing the firm's experience, assets, background, and ability to perform the required work without compromising quality, accuracy, reliability, and schedule.
Additional Notes
All responsible sources must be registered in the System for Award Management (SAM) database (www.sam.gov). Entities are advised to ensure their SAM registration is active, as processing updates, including the notarized letter requirement, can take several days.