SR Raft Alignment Systems & Load Levers
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The University of California, Lawrence Berkeley National Laboratory (LBNL), on behalf of the Department of Energy, has issued RFP No. MG-06152026 for SR Raft Alignment Systems & Load Levers. This solicitation seeks proposals for the supply and delivery of fabricated components for alignment system kits, crucial for the Advanced Light Source Upgrade Project (ALS-U). This is a Total Small Business Set-Aside. Proposals are due July 9, 2026, at 3:00 PM Pacific Time.
Opportunity Details
LBNL requires fabricated components for alignment system kits, which are installed between Storage Ring support plinths and rafts. The acquisition falls under LBNL's prime contract with the DOE. The North American Industry Classification System (NAICS) code is 332999 (All Other Miscellaneous Fabricated Metal Product Manufacturing), with a small business size standard of 750 employees.
Scope of Work
The requirement is divided into three work packages, for which offerors may propose on all or any combination:
- Work Package 1 (SR Alignment BOM): Fabrication, procurement, quality management, documentation, and kitting of alignment components (machined and commercial parts) for the raft-to-plinth assembly. Deliveries are scheduled from August 2026 through January 2027.
- Work Package 2 (Load Leveler Shim Type 01-05): Fabrication, quality management, and packaging of alignment shims for the raft-to-plinth assembly. Deliveries are scheduled from August to November 2026.
- Work Package 3 (Airloc™ Load Leveler): Procurement and quality acceptance of "Airloc™ 515-KSKC" brand load levelers or equal. Deliveries are scheduled from August to November 2026. Key tasks include fabricating, inspecting, and documenting parts; procuring specified off-the-shelf components with material certifications; packaging for safe transport; labeling for traceability; delivering complete kits; and providing comprehensive Quality Assurance (QA) documentation.
Contract & Submission
- Contract Type: Fixed-Price Subcontract.
- Period of Performance: Deliveries extend to January 2027.
- Set-Aside: Total Small Business.
- Offeror Questions Due: June 25, 2026, 3:00 PM Pacific Time.
- Proposals Due: July 9, 2026, 3:00 PM Pacific Time.
- Submission: Proposals must be submitted via email to mggrausz@lbl.gov.
- Required Documents: Price Proposal (Attachment A), Past Performance Reference Information Form (Attachment B), Representations & Certifications, and the ALS-U Supplier Quality Evaluation Survey.
Evaluation Criteria
Proposals will be evaluated based on technical acceptability and lowest evaluated price (LPTA). Technical evaluation factors include: ability to meet technical requirements, manufacturing capabilities and capacity (for Work Packages 1 & 2), delivery and schedule, prior experience and past performance, and an adequate Quality Management System or Quality Assurance Program. Non-technical criteria include the offeror's acceptance of the sample subcontract's terms, conditions, and general provisions. First Article approval is required within two weeks of receipt.
Special Requirements
Offerors must complete the ALS-U Supplier Quality Evaluation Survey. Environmental and sustainability requirements, including waste reduction and use of environmentally preferable products, are detailed. A dedicated Project Manager is required, along with monthly schedule/status updates and bi-monthly project meetings. A Windchill project portal will be used for document management.