Staging/Marshalling Area at Fort Campbell DB2B
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers (USACE) Louisville District is planning a Design-Build-to-Budget project for a Staging/Marshalling Area at Fort Campbell, KY. This Firm-Fixed-Price contract is a Total Small Business Set-Aside and involves constructing an 8,000 SF Readiness Building and a 400'x300' Deployment Readiness Line. The solicitation is anticipated for release in May 2026.
Scope of Work
The project entails the design and construction of an 8,000 SF Readiness Building and a 400'x300' Deployment Readiness Line. The total area will be paved with concrete, including fencing and lighting, with clearly identified Readiness Lines. This facility will support Fort Campbell's Power Projection Platform by providing a paved area for storing vehicles and equipment pre-inspected for Air Force certification, ready for immediate aircraft loading. Facilities must be designed for a minimum 40-year lifespan, adhering to DoD's Unified Facilities Criteria (UFC 1-200-02), including energy efficiencies, building envelope, and integrated building systems performance.
Contract & Timeline
- Type: Firm-Fixed-Price (FFP) Design-Build-to-Budget
- NAICS: 236220 - Commercial and Institutional Building Construction
- Set-Aside: Total Small Business Set-Aside
- Magnitude: Between $5,000,000 and $10,000,000
- Anticipated Solicitation Release: May 2026
- Published: April 14, 2026 (Advance Notice)
Evaluation
This will be a two-phase Design-Build-to-Budget procurement utilizing a Best Value Trade Off source selection process. The Government intends to award without discussions but reserves the right to conduct them.
- Phase I: Evaluation factors include Past Performance and Technical Approach. The highest-rated proposals (target of three) will be down-selected and invited to Phase II.
- Phase II: Evaluation factors include Design/Technical, Management Approach, and Price. Pro Forma information, such as bonding and financial capability, will also be required.
Additional Notes
Details regarding an optional site visit will be included in the solicitation. The official solicitation, when posted, will be available free of charge on SAM.gov. Offerors must have and maintain an active registration in the System for Award Management (SAM) at SAM.gov to be eligible for award. This announcement serves as an Advance Notice; responses to this synopsis are not required.
Point of Contact: Thomas Nauert (thomas.s.nauert@usace.army.mil).