STATOR,GENERATOR

SOL #: SPRTA1-26-C-0032JustificationSole Source

Overview

Buyer

DEPT OF DEFENSE
Defense Logistics Agency
DLA AVIATION AT OKLAHOMA CITY, OK
TINKER AFB, OK, 73145-3070, United States

Place of Performance

Place of performance not available

NAICS

Other Aircraft Parts and Auxiliary Equipment Manufacturing (336413)

PSC

Generators And Generator Sets, Electrical (6115)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 19, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Defense Logistics Agency (DLA) Aviation at Oklahoma City, OK has issued a Justification for Other Than Full and Open Competition for the acquisition of F15E Stator Generators (NSN/PN: 6115-01-231-8121HY/31169-2110). This acquisition is restricted to Safran Power USA LLC as the sole known source. The estimated value is over $750,000 but not exceeding $15,000,000.

Scope of Work

The primary requirement is for 78 Each of the F15E Stator Generator.

Contract Details

  • Type: Anticipated Firm-Fixed-Price, Fixed Quantity.
  • Set-Aside: Sole source acquisition, restricted to Safran Power USA LLC (CAGE: 3CPE0).
  • Authority: 10 U.S.C. 3204(a)(1) for items available from only one or a limited number of sources.
  • Published: February 19, 2026.

Eligibility & Justification

This acquisition is justified as sole source due to the item being AMC/AMSC 3/D, meaning reverse engineering is uneconomical, and technical data is not available or cannot be developed to permit full and open competition. A previous Sources Sought notice posted on SAM.gov (February 24 - March 3, 2025) yielded no interested responses. The synopsis is scheduled to be posted on or about April 30, 2025.

Additional Notes

The acquisition does not include options for increased quantity or extended terms. The 422 SCMS will continue to monitor the marketplace for overhaul source development and attempt to qualify additional sources for future acquisitions. Price analysis will be conducted for the estimated value.

People

Points of Contact

Jessie PaynePRIMARY

Files

Files

Download

Versions

Version 1Viewing
Justification
Posted: Feb 19, 2026
STATOR,GENERATOR | GovScope