Stone - Riprap
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, W6QM MICC-FT DRUM, is soliciting proposals for 10-inch Light Stone Rip Rap for heavy-duty erosion control. This is a re-solicitation following a previous cancellation due to price increases. Proposals are due April 15, 2026.
Scope of Work
The requirement is for 10-inch Light Stone Rip Rap, which should ideally be crushed limestone and angular for optimal interlocking and stability, specifically excluding rounded river rock. This material is intended for heavy-duty erosion control applications. The solicitation has been updated to clarify size and unit of measure.
Contract & Timeline
- Type: Combined Synopsis/Solicitation (for bulk mineral construction materials)
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Proposal Due: April 15, 2026, 3:00 PM Z
- Published: April 15, 2026
Additional Notes
This opportunity is a re-solicitation for the required riprap, as the previous attempt was cancelled due to price increases. Interested parties should review the solicitation for full details and submission instructions.